Skip to main content

Nepal's new pedestrian bridges

Improved pedestrian safety and smoother traffic flow will result from work being carried out by Nepal’s Department of Roads. The plan will see the construction of 15 pedestrian bridges along the Tinkune-Suryabinayak section of the Araniko Highway.
March 22, 2012 Read time: 2 mins
Improved pedestrian safety and smoother traffic flow will result from work being carried out by Nepal’s Department of Roads. The plan will see the construction of 15 pedestrian bridges along the Tinkune-Suryabinayak section of the Araniko Highway.

This congested stretch of road carries a heavy traffic volume of some 80,000 vehicles/day and the bridges are being built so as to reduce the incidence of fatal accidents along the route where pedestrians have been killed by vehicles.

Four of the 15 bridges are currently under construction at present and these are being built in Jadibuti, Lokanthali, Kaushaltar and Gatthaghar. The bridges will also be equipped with CCTV to maximise safety.

The four bridges currently under construction are expected to be complete within the end of July, 2012 (Nepal's fiscal year). The 15 crossing locations were chosen based upon factors including traffic flow, pedestrian crossing, business hub and previous road accidents. Although building the 15 bridges is expected to cost just US$1.2 million, this will make major improvements to safety while also boosting traffic flow.

The six lane Tinkune-Suryabinayak section of the Arankio Highway stretches 9km and was completed 8 months ago, with some funding being supplied by JICA in Japan.

Related Content

  • Nepal highway subsidence problem causing traffic disturbance
    March 11, 2017
    Subsidence on a key stretch of highway in Nepal is causing major traffic disturbance. The BP Highway, also known as the Banepa- Sindhuli- Bardibas Road, has suffered subsidence on the Nepalthok-Khurkot stretch. The collapsed section measures 27m long and is causing delays for drivers. This Highway is an important route as it connets Nepal’s capital Kathmandu with Eastern Terai. Vehicles have been diverted to an alternative route, although part of the roadway is still being used to carry traffic in one d
  • Digital cameras and VMS improve London and Scottish road safety
    March 18, 2016
    London and Scotland are using VMS and digital cameras to successfully lower road deaths. Road safety measures such as variable message signs (VMS) and digital cameras have boosted road safety in the UK capital London and also in the Scottish Highlands. And the systems need not be a drain on electricity supplies. Full matrix driver information signs from SWARCO Traffic, one of the UK’s leading traffic management technology providers, are being installed for the first time across the Transport for London (TfL
  • New highway for Nepal
    August 16, 2012
    A new stretch of highway is now open to traffic in Nepal. The Nepalthok-Khurkot Road recently had its official opening. Some US$46.2 million was spent on the section of highway, with much of the funding being provided by the Japanese Government. The Nepalthok-Khurkot section of road forms part of a larger project and is Phase 3, Part-I of the Banepa-Sindhuli-Bardibas BP highway.
  • India’s longest tolled expressway is open to traffic
    January 2, 2013
    Earlier this year, a new expressway was opened to traffic in India, adding connectivity to the country’s road network - Mike Woof reports. India’s economic growth has fuelled a massive construction boom in the country. Road building has been set as a priority by the Indian Government to help ensure continued economic development and improve connectivity between major population centres. One major new expressway has recently opened to traffic, having been designed to international standards and provides insi