Skip to main content

Highway traffic management and tunnel safety

Austria’s new A5 autobahn is now officially open to traffic and the highway is also the first in the country being built under the PPP model. The first 16km stretch of the highway was opened in November 2009 on schedule with the second 35km section now having been opened as well. The contract was carried out by concession company Bonaventura Strassenerhaltungs, a partnership headed by German company Hochtief and Austrian firm Alpine Bau each with 44.4% stakes while French firm Egis Preojects holds the remai
May 14, 2012 Read time: 2 mins
Austria’s new A5 autobahn is now officially open to traffic and the highway is also the first in the country being built under the PPP model. The first 16km stretch of the highway was opened in November 2009 on schedule with the second 35km section now having been opened as well. The contract was carried out by concession company Bonaventura  Strassenerhaltungs, a partnership headed by German company 981 Hochtief and Austrian firm 1332 Alpine Bau each with 44.4% stakes while French firm 2643 Egis Preojects holds the remaining 11.2%. The concession is for a 30 year period and the contract worth €933 million. In addition to being a shareholder in the concession company, 2376 EGIS Projects has provided 40% of the equipment supply and delivery contract, which is worth over
€50 million. Meanwhile its partners for this contract are Alpine Energy with 30% and Hochtief Construction with 30%. The deal included engineering, design, procurement and commissioning of all electro-mechanical and safety related equipment in the tunnels and the traffic management and communication systems for the entire length of the 51km long motorway. Early 2007, the project was selected as the Most Innovative Financing by the 713 International Road Federation (IRF) and awarded the 2007 IRF Global Road Achievement Award (GRAA).

For more information on companies in this article

Related Content

  • BAM half year results show jump in pre-tax profit
    August 19, 2016
    Dutch construction and related services group Royal BAM posted improved half-year results, despite Britain’s decision to leave the European Union. Half-year results to June showed pre-tax profit to €45 million, up from €4 million the previous year. However, group revenue slipped back €3.4 billion, down from around €3.5 billion. Construction and mechanical & electrical services suffered a €23.8 million loss, blamed on poor trading in Germany. But civil engineering and property helped profitability.
  • Eurasia Tunnel wins prestigious IRF award
    March 8, 2018
    New road connection linking Europe to Asia scoops IRF Global Road Achievement Award The Eurasia Tunnel was built to connect the Asian and European sides of Istanbul for the first time via a 3.4km twin-deck road tunnel going underneath the seabed. The 14.6km Eurasia Tunnel route was identified based on extensive feasibility studies conducted in 2005 for the Ministry of Transport, Maritime Affairs and Communications of Turkey. Its main aim was to relieve Istanbul’s transcontinental traffic pressure, reduce
  • US$3.4 billion Peru PPP road partnership
    April 11, 2024
    A US$3.4 billion Peru PPP road partnership deal has been awarded for Lima.
  • Malta-Gozo tunnel project plans
    July 1, 2020
    The Malta-Gozo tunnel project is being planned.