Skip to main content

Highway traffic management and tunnel safety

Austria’s new A5 autobahn is now officially open to traffic and the highway is also the first in the country being built under the PPP model. The first 16km stretch of the highway was opened in November 2009 on schedule with the second 35km section now having been opened as well. The contract was carried out by concession company Bonaventura Strassenerhaltungs, a partnership headed by German company Hochtief and Austrian firm Alpine Bau each with 44.4% stakes while French firm Egis Preojects holds the remai
May 14, 2012 Read time: 2 mins
Austria’s new A5 autobahn is now officially open to traffic and the highway is also the first in the country being built under the PPP model. The first 16km stretch of the highway was opened in November 2009 on schedule with the second 35km section now having been opened as well. The contract was carried out by concession company Bonaventura  Strassenerhaltungs, a partnership headed by German company 981 Hochtief and Austrian firm 1332 Alpine Bau each with 44.4% stakes while French firm 2643 Egis Preojects holds the remaining 11.2%. The concession is for a 30 year period and the contract worth €933 million. In addition to being a shareholder in the concession company, 2376 EGIS Projects has provided 40% of the equipment supply and delivery contract, which is worth over
€50 million. Meanwhile its partners for this contract are Alpine Energy with 30% and Hochtief Construction with 30%. The deal included engineering, design, procurement and commissioning of all electro-mechanical and safety related equipment in the tunnels and the traffic management and communication systems for the entire length of the 51km long motorway. Early 2007, the project was selected as the Most Innovative Financing by the 713 International Road Federation (IRF) and awarded the 2007 IRF Global Road Achievement Award (GRAA).

For more information on companies in this article

Related Content

  • Breakthrough for Slovenian Karavanke Tunnel
    April 2, 2024
    The existing tunnel Karavanke Tunnel tube between Austria and Slovenia opened in 1991.
  • How Florida paved the way for availability payments in the US
    November 21, 2014
    New financing models have been used to deliver key transport links in the US - * Patrick D Harder and Brandon J Davis Florida Department of Transportation’s (FDOT) public-private partnership (PPP) programme has made impressive progress, setting precedents for US transportation planning and funding. On March 26th 2014, FDOT opened 16km of new reversible express lanes as part of its US$1.8 billion I-595 Corridor Roadway Improvements Project. Just a few months later, on August 3rd 2014, FDOT opened twin tunnel
  • Checking up on the Czech Republic's Via Salis
    May 20, 2022
    Construction of the Via Salis, the Czech Republic’s first public-private partnership for a road project, is on schedule, according to VINCI which is leading the construction and operating consortium.
  • Financing model confirmed for German Autobahn
    June 27, 2016
    The refinancing package for Germany’s A8 Autobahn has now been formalised. The section of the A8 runs between Ulm and Augsburg in the south of Germany and is operated by concession firm Pansuevia, a 50:50 partnership between HOCHTIEF and STRABAG. The 58 km section of the A8 between Ulm and Augsburg was opened to traffic on schedule in September 2015 after four years of construction. PANSUEVIA designed, financed, and carried out the widening of the section to six lanes and took over maintenance and operation