Skip to main content

Highway traffic management and tunnel safety

Austria’s new A5 autobahn is now officially open to traffic and the highway is also the first in the country being built under the PPP model. The first 16km stretch of the highway was opened in November 2009 on schedule with the second 35km section now having been opened as well. The contract was carried out by concession company Bonaventura Strassenerhaltungs, a partnership headed by German company Hochtief and Austrian firm Alpine Bau each with 44.4% stakes while French firm Egis Preojects holds the remai
May 14, 2012 Read time: 2 mins
Austria’s new A5 autobahn is now officially open to traffic and the highway is also the first in the country being built under the PPP model. The first 16km stretch of the highway was opened in November 2009 on schedule with the second 35km section now having been opened as well. The contract was carried out by concession company Bonaventura  Strassenerhaltungs, a partnership headed by German company 981 Hochtief and Austrian firm 1332 Alpine Bau each with 44.4% stakes while French firm 2643 Egis Preojects holds the remaining 11.2%. The concession is for a 30 year period and the contract worth €933 million. In addition to being a shareholder in the concession company, 2376 EGIS Projects has provided 40% of the equipment supply and delivery contract, which is worth over
€50 million. Meanwhile its partners for this contract are Alpine Energy with 30% and Hochtief Construction with 30%. The deal included engineering, design, procurement and commissioning of all electro-mechanical and safety related equipment in the tunnels and the traffic management and communication systems for the entire length of the 51km long motorway. Early 2007, the project was selected as the Most Innovative Financing by the 713 International Road Federation (IRF) and awarded the 2007 IRF Global Road Achievement Award (GRAA).

For more information on companies in this article

Related Content

  • A new road maintenance approach developed jointly can improve efficiency
    April 11, 2013
    Innovative road maintenance solutions in Austria. A sophisticated system for managing maintenance tasks has been developed in Austria to meet the specific needs of a highway concession package. Bonaventura Straßenerhaltungs-GmbH is a 100%-owned business of the French company Egis Road Operation S.A., and was founded to provide the road maintenance services of the first Austrian PPP infrastructure project "Ypsilon"(PPP-Ostregion, Paket 1) granted by ASFINAG. The concessionaire won a 30-year contract in 2006
  • Atkins sells stake in London’s M25 ring road
    December 14, 2016
    Infrastructure engineering firm WS Atkins sold its stake in London’s M25 orbital road to a consortium of institutional investors for nearly €79 million (£66.3 million). Atkins, a publicly listed UK company, sold to Edge Orbital Holdings 2 Limited and the deal for its minority stake is expected to be complete by March 2017, the end of the financial year, according to a statement by Atkins. In October, the Edge Orbital consortium picked up Skanska’s 40% stake in Connect Plus, which manages the M25. Skanska so
  • STRABAG will lead A4 highway deal in Poland
    May 9, 2013
    Austrian contractor STRABAG is heading a consortium handling work to complete a section of Poland’s A4 highway between Krzyż and Dębica Pustynia. STRABAG’s subsidiary Heilit+Woerner is responsible for the contract, which was awarded by Poland’s General Directorate for National Roads and Highways (GDDKiA). The contract is worth €236 million (PLN 981 million), of which Heilit+Woerner has a 50% share. The work will be carried out over a 35km section of the route over and 18 month period. The work includes the
  • International tendering for Egyptian highway deal
    March 5, 2012
    Bidding is underway for a major highway project in Egypt, with the tender process attracting considerable international interest. The contract is worth some US$1 billion and is for the construction of the 35km Rod el-Farag highway. Construction work on the project is scheduled to commence in late 2011 and the highway will be built under the PPP model.