Skip to main content

Ecuador's new connection

A new bridge in Ecuador will improve transport connections in the country.
February 29, 2012 Read time: 1 min
A new bridge in Ecuador will improve transport connections in the country. The opening of this new structure is of note as it is the longest bridge in Ecuador. The Bahia de Caraquez-San Vicente road bridge cost some US$102 million to construct.

Related Content

  • Highway work boost in North Africa
    August 21, 2012
    North Africa is seeing construction business return - Mike Woof reports After a troubled period, stability looks to be returning to North African nations, which can only be good for the road construction sector. First Tunisia, then Egypt and finally Libya saw tumultuous revolts against the previous autocratic (and in one case at least, despotic) rulers. All three nations are now benefiting from a return to stability, with economic growth also improving once more.
  • Chile highway link faces future issues
    January 24, 2017
    Chile’s busy Route 68 between capital Santiago and the country’s main port of Valparaiso faces an uncertain future. The 110km highway carries heavy traffic volumes and is close to its capacity of 4,500 vehicles/hour at peak periods, with extensive works required to improve the route. The work to upgrade Route 68 is expected to cost up to US$170 million, with eight sections of the highway in particular need of attention. The tender process for the upgrade work will open shortly. The Chilean Government opt
  • Bolivia-Brazil bridge tender opening
    November 20, 2023
    The tender is opening for a new Bolivia-Brazil bridge link.
  • Colombia’s longest bridge – on track for completion
    March 23, 2018
    Colombia’s longest bridge is on track for completion shortly. The 4.7km-long bridge provides a connection over the Cienaga de la Virgen wetland area. The new bridge forms part of the dual carriageway road link between Cartagena and Barranquilla. When complete, it will also be the third longest bridge in Latin America. The project has been complex due to the environmentally sensitive nature of the area where it is being built. To minimise impact the builders have used pre-fabricated components and assembled