Skip to main content

Communications systems key to tunnel safety

Paul Ducker Systems (PDS), a sub-contractor to Balfour Beatty Engineering Services, has appointed Team Simoco to provide communication systems for the new A3 Hindhead road tunnel and the refurbishment of the A1 Hatfield road tunnel. Specialising in supplying transportation infrastructure for tunnels and road networks, PDS also provides solutions to metro, rail and airport operators, and the Hindhead and Hatfield road tunnels, near London, are the latest contracts to be won by the company. PDS has selecte
May 15, 2012 Read time: 2 mins
Hindhead road tunnel.
Paul Ducker Systems (PDS), a sub-contractor to 1146 Balfour Beatty Engineering Services, has appointed Team Simoco to provide communication systems for the new A3 Hindhead road tunnel and the refurbishment of the A1 Hatfield road tunnel.

Specialising in supplying transportation infrastructure for tunnels and road networks, PDS also provides solutions to metro, rail and airport operators, and the Hindhead and Hatfield road tunnels, near London, are the latest contracts to be won by the company.

PDS has selected Team Simoco to design and implement an extensive communication system for the tunnels, with each requiring GSM mobile, Airwave, fireground, DAB, voice-break in and a dedicated PMR radio system.
Chief executive of Team Simoco, Ian Carr, says: “Both the Hindhead and Hatfield road tunnels are designed to offer vehicles more convenient and quicker journeys, but due to the high volumes of traffic that travel along these routes, it is imperative that the communication systems in place offer reliable and uninterruptable access in case of accidents or fires.

“Team Simoco has extensive experience of confined space radio engineering, leaky feeder technology and the specific signal propagation challenges of combining multiple radio services in enclosed environments such as tunnels. This expertise enabled us to work with PDS to design the best operational solution for the Hindhead and Hatfield tunnels.”

Located in County Surrey, between London and Portsmouth, the Hindhead twin-bore road tunnel is designed to remove traffic congestion from the A3 and the local road network. Work began on the project in 2007 and the tunnel is scheduled to open to traffic in summer 2011. The Hatfield road tunnel in Hertfordshire is also due to be reopened to traffic in the summer of 2011.

For more information on companies in this article

Related Content

  • Variable message signs aid parking, traffic control
    February 14, 2012
    From the highway to the parking space: message sign technology has proved that it simplifies wayfinding Variable message signs (VMS) are often located at key decision points on busy highways to help manage the network by providing advanced warning to drivers of emergencies and incidents. They are also used to warn drivers of events that may cause delays in the future such as road works and major events. An example comes from the USA where, to stimulate economies and refresh downtown areas, cities are build
  • Netherlands reviews tunnel safety
    May 15, 2012
    Questions are being asked in the Netherlands following the news that twin road tunnels planned to form part of the new 7km stretch of the A4 highway between Delft and Schiedam will not meet EU safety regulations. The Dutch Commission for Tunnel Safety says that the link, which has a total of eight lanes, will not meet the EU regulations, which were toughened after a series of tunnel disasters in Austria and Switzerland. Instead the commission wants four tunnels to be built, each for two lanes of traffic,
  • Emovis wins Mont Blanc tolling deal
    December 19, 2024
    Emovis - part of Abertis Mobility Services - will supply the public company Mont Blanc Motorways and Tunnel - ATMB - with a free-flow tolling system in France’s Haute-Savoie region.
  • Smombies! Look out!
    February 12, 2021
    Our city streets are being invaded by smartphone zombies, but help is on the way