Skip to main content

Communications systems key to tunnel safety

Paul Ducker Systems (PDS), a sub-contractor to Balfour Beatty Engineering Services, has appointed Team Simoco to provide communication systems for the new A3 Hindhead road tunnel and the refurbishment of the A1 Hatfield road tunnel. Specialising in supplying transportation infrastructure for tunnels and road networks, PDS also provides solutions to metro, rail and airport operators, and the Hindhead and Hatfield road tunnels, near London, are the latest contracts to be won by the company. PDS has selecte
May 15, 2012 Read time: 2 mins
Hindhead road tunnel.
Paul Ducker Systems (PDS), a sub-contractor to 1146 Balfour Beatty Engineering Services, has appointed Team Simoco to provide communication systems for the new A3 Hindhead road tunnel and the refurbishment of the A1 Hatfield road tunnel.

Specialising in supplying transportation infrastructure for tunnels and road networks, PDS also provides solutions to metro, rail and airport operators, and the Hindhead and Hatfield road tunnels, near London, are the latest contracts to be won by the company.

PDS has selected Team Simoco to design and implement an extensive communication system for the tunnels, with each requiring GSM mobile, Airwave, fireground, DAB, voice-break in and a dedicated PMR radio system.
Chief executive of Team Simoco, Ian Carr, says: “Both the Hindhead and Hatfield road tunnels are designed to offer vehicles more convenient and quicker journeys, but due to the high volumes of traffic that travel along these routes, it is imperative that the communication systems in place offer reliable and uninterruptable access in case of accidents or fires.

“Team Simoco has extensive experience of confined space radio engineering, leaky feeder technology and the specific signal propagation challenges of combining multiple radio services in enclosed environments such as tunnels. This expertise enabled us to work with PDS to design the best operational solution for the Hindhead and Hatfield tunnels.”

Located in County Surrey, between London and Portsmouth, the Hindhead twin-bore road tunnel is designed to remove traffic congestion from the A3 and the local road network. Work began on the project in 2007 and the tunnel is scheduled to open to traffic in summer 2011. The Hatfield road tunnel in Hertfordshire is also due to be reopened to traffic in the summer of 2011.

For more information on companies in this article

Related Content

  • GTT wins in West Bend with Opticom traffic pre-emption solution
    April 7, 2017
    Global Trafic Technologies (GTT) has been contracted by the US city of West Bend in Wisconsin state to upgrade its traffic pre-emption solution to Opticom. Optimcom works alongside intersection controllers to help emergency vehicles navigate intersections rapidly but safely. When an emergency vehicle needs to navigate an intersection, the Opticom Emergency Vehicle Pre-emption system on board the emergency vehicle sends a request to the intersection’s controller ahead of its arrival. The request tur
  • IRF presents new online training resources
    April 30, 2021
    As the world continues to deal with the long-term implications of the COVID-19 pandemic, the International Road Federation has heeded the call by the world’s road professionals for more online training resources
  • New EU-Russian highway connection
    February 18, 2013
    Among the forests and lakes of Finland, one of Europe's newest motorway links is being built as a Green highway linking Europe to Russia - Adrian Greeman reports The road eastwards from Finland's capital Helsinki, along the north coast of the Gulf of Finland, has not carried heavy traffic volumes, at least until recent times. Highway seven as it is designated locally, or E18 in European nomenclature, is partly motorway but in some sections still dual carriageway or even just a single lane each way, finishin
  • Liebherr’s new PR 756 Litronic crawler tractor
    February 19, 2015
    Liebherr’s PR 756 Litronic crawler tractor is one of two new models in its now three-strong Generation 6 crawler tractor programme. Like the PR 736 and PR 746, the PR 756 is Stage IV engine emission standard and offers a six-cylinder 250kW engine. The model’s operating weight ranges from 38.3-41.15tonnes. The main components of the PR 756 come from Liebherr’s own production facility. Among these are the diesel engine and the common rail injection system as well as the hydraulic and electronic components.