Skip to main content

Communications systems key to tunnel safety

Paul Ducker Systems (PDS), a sub-contractor to Balfour Beatty Engineering Services, has appointed Team Simoco to provide communication systems for the new A3 Hindhead road tunnel and the refurbishment of the A1 Hatfield road tunnel. Specialising in supplying transportation infrastructure for tunnels and road networks, PDS also provides solutions to metro, rail and airport operators, and the Hindhead and Hatfield road tunnels, near London, are the latest contracts to be won by the company. PDS has selecte
May 15, 2012 Read time: 2 mins
Hindhead road tunnel.
Paul Ducker Systems (PDS), a sub-contractor to 1146 Balfour Beatty Engineering Services, has appointed Team Simoco to provide communication systems for the new A3 Hindhead road tunnel and the refurbishment of the A1 Hatfield road tunnel.

Specialising in supplying transportation infrastructure for tunnels and road networks, PDS also provides solutions to metro, rail and airport operators, and the Hindhead and Hatfield road tunnels, near London, are the latest contracts to be won by the company.

PDS has selected Team Simoco to design and implement an extensive communication system for the tunnels, with each requiring GSM mobile, Airwave, fireground, DAB, voice-break in and a dedicated PMR radio system.
Chief executive of Team Simoco, Ian Carr, says: “Both the Hindhead and Hatfield road tunnels are designed to offer vehicles more convenient and quicker journeys, but due to the high volumes of traffic that travel along these routes, it is imperative that the communication systems in place offer reliable and uninterruptable access in case of accidents or fires.

“Team Simoco has extensive experience of confined space radio engineering, leaky feeder technology and the specific signal propagation challenges of combining multiple radio services in enclosed environments such as tunnels. This expertise enabled us to work with PDS to design the best operational solution for the Hindhead and Hatfield tunnels.”

Located in County Surrey, between London and Portsmouth, the Hindhead twin-bore road tunnel is designed to remove traffic congestion from the A3 and the local road network. Work began on the project in 2007 and the tunnel is scheduled to open to traffic in summer 2011. The Hatfield road tunnel in Hertfordshire is also due to be reopened to traffic in the summer of 2011.

For more information on companies in this article

Related Content

  • Balfour Beatty Mott McDonald secure key H Agency contract
    June 15, 2012
    The Highways Agency has awarded the second of its new Asset Support Contracts to Balfour Beatty Mott MacDonald. The contract involves maintaining and improving the network of motorways and major ‘A’ roads in the North West. It will cover the Agency’s roads in Cheshire, Greater Manchester, Merseyside and south Lancashire and will go live from November 2012. Cumbria and the remainder of Lancashire are covered by a separate contract. The key contract will ensure motorways and major 'A' roads in the region co
  • A case for the new CX245D SR excavator on a Belgium jobsite
    June 22, 2018
    The first Case CX245D SR minimum-swing radius excavator was delivered to contractor Terrassement Berger and is at work on a jobsite in Flémalle, Belgium. Terrassement Berger, based near Liège, Belgium, purchased the minimum-swing radius CX245D SR excavator even before it was launched. The contractor specialises in earthmoving work in urban and extra-urban jobsites. They wanted a machine that would enable them to expand the type of jobs they took on. The CX245D SR minimum-swing radius excavator is designed
  • Industry consultation delivers draft ITS strategy for Australia
    April 24, 2012
    A draft National ITS Industry Strategy developed through extensive industry and government stakeholder consultation has been released for public comment by ITS Australia. It encompasses road, rail, sea and air transport from 2012 to 2017. Its purpose is to improve the safety, economic and environmental performance of Australia's transport networks by capitalising on state of the art ITS technologies and integrating those technologies across the networks. ITS Australia CEO Susan Harris said the strategy f
  • Collaborative approach is delivering the Queensferry Crossing
    March 28, 2017
    The Queensferry Crossing forms the centrepiece of a major upgrade to the cross-Forth transport corridor in the east of Scotland. It will be the longest three-tower, cable-stayed bridge in the world and represents a Scottish Government capital investment of more than €1.5 billion. The 2.7km Queensferry Crossing is alongside the Forth Road Bridge and will carry the M90 motorway across the Firth of Forth between Lothian, at South Queensferry, and Fife, at North Queensferry. Each of the three towers are 207m