Skip to main content

WJ achieves Costain’s Standard of Excellence on smart motorways

UK road marking specialist WJ has maintained its excellence in supply chain performance for Costain, one of the country’s major highways engineering specialist contractors. Costain Cares is the contractor’s programme to build a long-term sustainable business that creates economic, environmental and social value and their supply chain relationships are fundamental to achieving that vision.
December 14, 2017 Read time: 2 mins
Marking time: WJ retains its supplier excellence rating with Costain
UK road marking specialist 8037 WJ has maintained its excellence in supply chain performance for 2319 Costain, one of the country’s major highways engineering specialist contractors.


Costain Cares is the contractor’s programme to build a long-term sustainable business that creates economic, environmental and social value and their supply chain relationships are fundamental to achieving that vision.

WJ has been one of Costain’s top performing suppliers for just over two years and again has been awarded “Defining Blue” status for two M1 smart motorway contracts: Junctions 28-31 and Junctions 32-35, said Andy Walker, WJ commercial director.

WJ Group is a UK road marking business specialising in permanent and temporary road markings, road studs, high friction and safety surfacing, asphalt repair, Hydroblast line removal and surface retexturing.

Costain said that its Defining Blue supply chain review analyses supplier performance in a more qualitative and proactive way that clarifies expectations and communicates these expectations on a quarterly basis. These are measured against agreed criteria including safety, quality, people, cost and time. Performance is colour coded, with Blue achieving excellence, hence Defining Blue score criteria is the objective.

For more information on companies in this article

Related Content

  • Green road construction for Costain
    March 11, 2025
    Costain has achieved recognition for green road construction.
  • Automated testing is safer, cheaper and more thorough
    December 12, 2018
    Automated testing is improving safety during paving and saving on testing costs. But it could also help reduce long-term maintenance costs too - Kristina Smith writes Testing pavements as they are laid can be a hazardous activity. The technician may be on their hands and knees, far behind the main gang, or reaching inside the hopper to measure the temperature of the hot mix or dodging rollers to take density readings.
  • Geveko Markings: committed to safety
    February 28, 2025
    Achieving Europe’s Vision Zero - eliminating road fatalities - requires a united effort from everyone in the road marking sector, both public and private. Collaboration and innovation are key to creating safer, more sustainable, and more efficient roads, from highways to bike lanes. Global company Geveko Markings is dedicated to this mission and shares its commitment to Vision Zero and beyond.*
  • PPRS Nice 2018: maintenance moves mountains
    June 22, 2018
    Strategic maintenance was a major theme at the second Pavement Preservation and Recycling Summit in Nice, France. The world is changing, mobility is changing and so roads must change and adapt for the future.” With this brief statement, Jacques Tavernier opened the second PPRS Summit. “At the same time there is a growing awareness of poor or non-existent maintenance for highways. The question for this conference is how to adapt road maintenance in the face of this challenge,” said Tavernier, in his role as