Skip to main content

Weathering WIM installation

Kistler says that its new smartphone App has made it easier to properly install sensors for its weigh-in-motion systems.
March 8, 2021 Read time: 2 mins
Thanks to an app from sensor manufacturer Kistler, documentation is easier and more practical

Sensors in the road surface record the weight of vehicles while driving – without impairing the flow of traffic. But installation has involved a considerable inconvenience - having to document the process on paper forms, notes Kistler, a global Swiss company that focuses on measurement technologies for dynamic pressure, force, torque and acceleration.

Thanks to its new app, documentation is not only easier and more practical, but also comes with the extra advantage of real-time support from WIM specialists.

Sensor installation usually takes only a few hours. However, factors such as weather on the day of installation or road conditions, can significantly affect the durability of measurement equipment and sensors. These factors also influence the quality of measurements.

For instance, when installed in a wet slot, the adhesion of the grout will be weak, leading to bad fixation of the sensors in the road. To ensure the sensors’ longevity and accuracy and to grant the customer full warranty, the installation process has to be documented carefully. Usually, this means filling out pages-long paper forms at the installation site. But this is rarely very practicable, especially during a night-time installation or when standing in the middle of a road in windy weather. The forms are often lost or illegible - or technicians simply forget about them.

Thanks to the new WIM app from Kistler, documentation is now more practical and less time-consuming. Technicians easily enter information using a smartphone. The site is located via GPS and a photo of the installation plan functions as the basic site layout. Meanwhile, close-up photos of the pavement suffice as documentation of the road conditions. The sensor is identified by scanning its bar code.

The app is clearly structured and guides users through the installation steps. Green symbols indicate that the form is completed. The data is then submitted to Kistler and assessed by a specialist for immediate feedback and support. The onsite technician receives a PDF report for each WIM site and is notified that Kistler has approved the installation. The app can be used by any registered technician and is available for iOS and Android.

 

For more information on companies in this article

Related Content

  • Machine visibility in focus from EU Commission
    November 9, 2015
    All round visibility from the operator’s seat of a construction machine is a topic in focus at the EU Commission. This has been a topic of concern for the construction machinery sector ever since the EU Commission released a warning relating to the standard. This standard has provisions covering visibility requirements for earth-moving machinery. A position paper is intended to help clarify the situation.
  • GPS machine control improves construction accuracy
    February 29, 2012
    The latest GPS systems will improve the accuracy of many construction operations. Mike Woof reports. The pace of technological advancement is fast in the GPS market. Despite a market downturn, the GPS solution providers continue to invest in research and development. And there is evidence to suggest that the contracting sector is more keen than ever to employ the latest technology because of the cost benefits this can bring.
  • Seeing is believing: Bomag’s Digital Field Service
    April 27, 2018
    Bomag is customer-testing a new Digital Field Service has the potential to redefine onsite maintenance … globally. The focus here is not digitisation for its own sake. Rather, it is an attempt to reduce downtime by linking a maintenance operator on site, wearing a construction hard hat with a built-in camera and a “heads up” mini-screen in view, remotely guided by a Bomag expert back at the company’s headquarters. Problems on site can be talked through, whether the machine is 1km or 1,000km away. Bomag
  • The Preston Western Distributor
    September 7, 2023
    Costain, as main contractor for the Preston Western Distributor project, was involved from the earliest stages, thanks to the UK’s Early Contractor Involvement approach. The project was delivered on time and on budget to the benefit of the local environment, local businesses and the region’s workforce. David Arminas reports*