Skip to main content

UK’s Saltash Tunnel gets hi-tech safety upgrade

The UK's Saltash Tunnel is undergoing a major US$1.53 million upgrade to the incident detection system to provide quicker detection of vehicle fires and other incidents. The scheme will see close to 5,000m of cable installed inside the 410m tunnel on the A38 in the county of Cornwall in England. Overall design of the new system and integrated control systems are from PDS – Paul Ducker Systems – and includes smoke detectors from UK firm SICK Sensor Intelligence and SmartVision fiber-optic temperature sensi
June 4, 2019 Read time: 2 mins
More than US$1.5 million of new safety equipment is being installed in the Saltash Tunnel in England
The UK's Saltash Tunnel is undergoing a major US$1.53 million upgrade to the incident detection system to provide quicker detection of vehicle fires and other incidents.


The scheme will see close to 5,000m of cable installed inside the 410m tunnel on the A38 in the county of Cornwall in England.

Overall design of the new system and integrated control systems are from PDS – Paul Ducker Systems – and includes smoke detectors from UK firm 3316 SICK Sensor Intelligence and SmartVision fiber-optic temperature sensing systems from AP Sensing in Germany. Way-finding signs are from Roomfoss.

All the systems will be aligned to the public address system – installed along with a new CCTV system two years ago - to direct drivers to the safest tunnel exit in the event of an incident, according to 8100 Highways England.

The tunnel, which opened in 1988, has a speed limit of 50kph and a reversible central lane to cope with holiday and rush hour traffic. Each day, more than 38,000 motorists use the tunnel  that was designed by Mott, Hay and Anderson, built by 1146 Balfour Beatty and has a design life of at least 100 years.

Highways England said it will hold joint emergency test exercises with the fire services and police when work is finished sometime this spring.

For more information on companies in this article

Related Content

  • Delta Bloc solution for major upgrade to UK’s M6 motorway
    February 8, 2018
    Delta Bloc’s structural precast concrete barriers have been supplied for a €308 million smart motorway project being undertaken by Highways England on the M6 Motorway. UK contractor Charcon Construction Solutions worked with Delta Bloc UK, which develops, manufactures, supplies and installs permanent and temporary concrete road safety barriers. The Highways England scheme between junction 16 at Crewe and junction 19 at Knutsford has seen a new 32km concrete safety barrier installed in the central reservat
  • UK’s A14 route to open early
    February 11, 2020
    Highways England has announced that the UK’s A14 route is to open early.
  • Towering safety presence
    July 18, 2012
    Italian firm TowerLight has launched a new mobile security system for the surveillance, CCTV and security markets. Unveiled at last month’s IFSEC International security exhibition at the NEC in Birmingham, England, the TL Security Tower can accommodate CCTV cameras, Wi Fi systems, surveillance monitoring, infra-red detectors, evidence quality video equipment and public address loudspeakers. Entirely self-contained, the Tower’s power is provided from a series of batteries combined with a built-in generator
  • UK motorway upgrade ahead of schedule
    May 1, 2014
    Joint venture contractor Skanska Balfour Beatty has completed work on a 19km section of the M25 motorway in the UK, six months ahead of schedule. Work on the M25 scheme between junctions 5 and 7 in Kent and Surrey forms part of a new generation of technology-driven improvements on the UK’s strategic road network.