Skip to main content

UK’s Saltash Tunnel gets hi-tech safety upgrade

The UK's Saltash Tunnel is undergoing a major US$1.53 million upgrade to the incident detection system to provide quicker detection of vehicle fires and other incidents. The scheme will see close to 5,000m of cable installed inside the 410m tunnel on the A38 in the county of Cornwall in England. Overall design of the new system and integrated control systems are from PDS – Paul Ducker Systems – and includes smoke detectors from UK firm SICK Sensor Intelligence and SmartVision fiber-optic temperature sensi
June 4, 2019 Read time: 2 mins
More than US$1.5 million of new safety equipment is being installed in the Saltash Tunnel in England
The UK's Saltash Tunnel is undergoing a major US$1.53 million upgrade to the incident detection system to provide quicker detection of vehicle fires and other incidents.


The scheme will see close to 5,000m of cable installed inside the 410m tunnel on the A38 in the county of Cornwall in England.

Overall design of the new system and integrated control systems are from PDS – Paul Ducker Systems – and includes smoke detectors from UK firm 3316 SICK Sensor Intelligence and SmartVision fiber-optic temperature sensing systems from AP Sensing in Germany. Way-finding signs are from Roomfoss.

All the systems will be aligned to the public address system – installed along with a new CCTV system two years ago - to direct drivers to the safest tunnel exit in the event of an incident, according to 8100 Highways England.

The tunnel, which opened in 1988, has a speed limit of 50kph and a reversible central lane to cope with holiday and rush hour traffic. Each day, more than 38,000 motorists use the tunnel  that was designed by Mott, Hay and Anderson, built by 1146 Balfour Beatty and has a design life of at least 100 years.

Highways England said it will hold joint emergency test exercises with the fire services and police when work is finished sometime this spring.

For more information on companies in this article

Related Content

  • UK's managed motorways scheme improves journey times
    April 11, 2012
    "One of the most important challenges for the Highways Agency (HA) is the management of Britain's motorways to improve traffic flows, reduce congestion, cut travel times and maintain better local air quality. But as traffic volumes increase, the HA is constantly looking for more economical, effective and sustainable methods of managing the country's motorways. "The Managed Motorway concept uses detectors to measure congestion, control software to display mandatory speed signs and an enforcement system to
  • Highways England launches Maintenance Assistance Vehicle - MAV
    July 7, 2016
    Highways England has developed a vehicle to help replace overhead highway signs that it says will reduce the need to close lanes and roads during work The vehicle uses a hydraulic scissor lift similar to that seen on catering vehicles that load food into the hold of airplanes at airports. Traditionally, signs are taken down and installed using a flatbed truck, crane and cherry picker, taking up to 40 minutes. However, the Maintenance Assistance Vehicle (MAV) can do this in around 20 to 25 minutes by usin
  • LED road studs provide tunnel guidance
    May 3, 2012
    Safety in tunnels is of paramount importance, and in 2014 the European Union will be introducing new safety rules for such structures. As in other parts of the world, many tunnels under construction will be built to high standards incorporating the latest technologies.
  • LED road studs provide tunnel guidance
    February 10, 2012
    Safety in tunnels is of paramount importance, and in 2014 the European Union will be introducing new safety rules for such structures. As in other parts of the world, many tunnels under construction will be built to high standards incorporating the latest technologies. Many others are being upgraded, including the Elbetunnel, Hamburg, Germany, where the first tunnel under the River Elbe was built in 1911.