Skip to main content

UK gets its first wrong-way slip detection installation

Drivers mistakenly travelling in the wrong direction towards traffic exiting motorways and dual carriageways will be alerted using a pioneering warning system in Scotland.
February 13, 2020 Read time: 2 mins
Clearly viewed, it’s the right solution for a wrong turn

Road operator Amey commissioned Clearview Intelligence to install the country’s first wrong-way slip detection on slip roads near the villages and towns of Philpstoun, Wallyford, Tranent and Lasswade. It follows reports of numerous vehicles turning onto the slip lanes and into the path of motorists exiting the motorways and dual carriageways at high speed.

“This is the first time such a solution has been implemented in Scotland and we are proud to be the team to deliver it,” said Chris Keenan,  general manager for the Scottish region with Clearview. “By travelling the wrong way on these slip lanes drivers risk a head-on collision with motorists exiting the junction or driving into the path of three lanes of oncoming traffic if they reach the motorway carriageway.

At all locations there was a static no-entry sign and white road markings to indicate one-way traffic flow.

Clearview’s system detects vehicles incorrectly turning onto the slip road and uses vehicle activated signs to flash a no-entry warning sign to the transgressing motorist, instantly alerting them of their error.

The system uses inductive loops installed in the carriageway and Clearview’s M680 count and classify system to register the direction of vehicles travelling along the slip lanes. When it detects a vehicle travelling the wrong way, it triggers solar powered vehicle activated signs to flash a no-entry symbol ahead of the drivers, prompting them to turn around.

At both Tranent and Lasswade, Clearview’s system includes cameras and an auto-alert system from the company’s Insight software platform to notify the Traffic Scotland control centre of a potential hazard.

“Since installing the system, we have recorded incidents of drivers travelling the wrong way at each of these sites, but fortunately turning around in time to avoid colliding with traffic coming at high speeds in the opposite direction,” said Keenan.

For more information on companies in this article

Related Content

  • Green Light for signs
    June 18, 2012
    The project to install Variable Message Signs (VMS), recently approved by Staffordshire County Council, will provide motorists with important travel and road safety information, and up-to-date warnings of incidents and accidents to help them avoid trouble spots and possible congestion. Michael Smith, the county council’s senior highways project engineer, said: “‘In addition to representing good value for money, the company has a sound track record in this area having already successfully supplied and instal
  • Green Light for signs
    June 26, 2012
    The project to install Variable Message Signs (VMS), recently approved by Staffordshire County Council, will provide motorists with important travel and road safety information, and up-to-date warnings of incidents and accidents to help them avoid trouble spots and possible congestion. Michael Smith, the county council’s senior highways project engineer, said: “‘In addition to representing good value for money, the company has a sound track record in this area having already successfully supplied and instal
  • Weigh in motion technology reduces road damage
    February 8, 2012
    Overweight vehicles cause enormous damage to road structures but they can be caught, even at high speed. Weigh-in-motion or WIM devices are designed to capture and record axle weights and gross vehicle weights as vehicles drive over a measurement site.
  • SWARCO completes installation on UK’s busiest north east highways
    March 22, 2017
    SWARCO has installed a network of 27 variable message signs at some of the busiest highway locations in the northern UK’s Tyneside region. The signs give motorists key information to help them plan their journey and warn them of weather disruption and other potential hazards. Planning and coordinating all works with each local authority was the major challenge, requiring some of the installations to be made in the dead of night. The city of Newcastle was the contracting local authority acting for the Nor