Skip to main content

Tough signs

The novel Tuff Curb system developed in the US offers a durable, high performance separator kerb product. The TuffCurb system can be used in conjunction with the range of spring-mounted posts and signs from Impact Recovery Systems. Highly versatile this kerbing system is said to be easy to install and can be used for curves, medians, edge lines, work zones and rail crossings.
February 7, 2012 Read time: 2 mins
The novel TuffCurb system uses reactive springs that can support a flexible post as well as an information panel
The novel Tuff Curb system developed in the US offers a durable, high performance separator kerb product. The TuffCurb system can be used in conjunction with the range of spring-mounted posts and signs from 2336 Impact Recovery Systems. Highly versatile this kerbing system is said to be easy to install and can be used for curves, medians, edge lines, work zones and rail crossings. The Tuff Curb sections have been tested by the 2347 Texas Transportation Institute. Measuring 1.02m long the units are made of durable polyethylene and feature the IRS quick release system, which is designed to allow upright installation/replacement in less than 5 seconds. The end caps measure 457mm long and should be used at the beginning and end of installation. The units feature an innovative rib design underneath that helps transfer load to the road and reduces the stress on the mounting hardware. This unit gives on impact and is then designed to re-orientate the panel towards traffic.

A wide variety of approved upright sections are available and these are offered in yellow or white for high visibility, although other colours are available if requested. No special tools or pins are required for installation while there is no need for scuppers to catch debris that can impede water flow and placing the units 12-25mm apart allows rain water to pass freely without build-ups occurring. In addition to two raised pavement markers, which come standard on each curb section, the firm recommends the use of a tubular marker, delineator or sign on each section to maximise visibility to motorists.

For more information on companies in this article

Related Content

  • Washington DC’s historic bridge replacement project
    June 11, 2019
    The project to replace a historic bridge in US capital Washington DC is providing major challenges for its builders - Mike Woof writes
  • Crushing and screening advances introduced
    June 10, 2019
    New developments in crushing and screening equipment as well as washing technology will deliver benefits for materials production - Mike Woof writes Competition is tough in the market for quarry material processing equipment, with key firms introducing new systems that are said to boost capacity and performance. Firms offering crushing and screening equipment have expanded their respective ranges, offering additional capabilities for these segments. Mobility and versatility have been key factors in the d
  • Efficient earthmoving builds new road links
    February 7, 2012
    Efficient earthmoving is allowing productive road construction in the Egyptian desert, Mike Woof reports. Despite ferocious desert temperatures, efficient earthmoving operations will help build new road links in Southern Egypt. Close to the Egyptian city of Assuit, the contractor Orascom is working on three key desert highway projects that will provide vital transport connections for the country's growing economy.
  • Texas certification of RetroTek-MU operator a first
    July 27, 2018
    Striping Service and Supply is the first US contractor certified by the Texas Department of Transportation to operate the RetroTek-MU road striping Retroreflectometer. The Texas A&M Transportation Institute stringent certification programme provides a quantitative basis for evaluating the ability of a contractor to operate the RetroTek-MU retroreflectometer. The vehicle-mounted RetroTek-MU - manufactured by Reflective Measurement Systems, based in Dublin, Ireland - measures the retroreflectivity of lo