Skip to main content

A titan of a barrier gate from SMA

SMA Road Safety’s new Titanus barrier gate is tested in class H4B to allow for continuity of H4 barriers. Meanwhile, thanks to its W2 working width, SMA says that Titanus is ideal for areas characterised by a reduced length opening section.
April 5, 2022 Read time: 2 mins
The new Titanus barrier gate from Italian firm SMA Road Safety is lightweight, making it suitable for use on bridges and viaducts

Also, the gate is lightweight, making it suitable for installation on bridges and viaducts, all without increasing drastically the loads on the bridge’s decks.

The new Titanus CE certified system is supplied in pre-assembled modules of 6m and is adaptable to different lengths. The gate can be opened in only two minutes and acts as an element of continuity between steel or concrete barriers. It is tested for containment level class H4b with an integrated sliding module in accordance with ENV 1317-4:2003.

The full system length is 40m with pole spacings of 1.5m.

Installation of the system requires only positioning and anchoring to the ground which takes place by means of internally threaded sleeves on which the pole plate is screwed. The connection of the terminal elements to the traffic barrier is done using adjustable connection pieces in order to correct the distance from the barrier during installation.

Finally, the gate can be swung fully open for the system’s entire length thanks to a series of small convenient dolly wheels on the lower half of the assembly.

“If a barrier gate exceeds 40m in length, it must be tested according to part 2 of EN 1317 as a longitudinal barrier,” explained  Mauro Corsanici, crash analyst with SMA Road Sasfety. “But if it has a shorter length, it is treated as a transition, according to the voluntary norm EN 1317 part 4. For transitions, however, the standard says that interconnections with gaps greater than one class must be avoided, namely an H4b barrier must be connected with an H3 barrier gate and not H2.”

Finding a practical solution is hard but the Titanus fits the bill – and the regulations, he says. The Titanus is manufactured at SMA Road Safety’s factory located in Marcianise, just north of Naples, Italy. 

For more information on companies in this article

Related Content

  • Almost gone: Canada’s old Port Mann Bridge deconstructed
    August 14, 2015
    Three years ago a welder’s cut halved Canada’s old Port Mann Bridge. David Arminas reports from the banks of the Fraser River. By the time this issue of World Highways reaches you, one of Canada’s iconic steel arch bridges will be a shadow of its former self. It’s been a three-year demolition job since the first cut across the deck of the old Port Mann Bridge just outside the city of Vancouver on Canada’s Pacific coast. A new 10-lane 2.2km Port Mann Bridge opened in 2012 (see box). It runs parallel to the o
  • Protecting the roadway with guard rails
    November 10, 2015
    Tata Construction Products is a major player in the European road protection market and aims to boost its share of business - Mike Woof writes. Part of the massive Tata Group, Tata Construction Products is a major player in Europe’s business segment for steel guard rails. Rodney Rice, marketing manager, Tata Steel Construction Products, said, “Our market is predominantly Europe.”
  • Norway's bridge meets tough environmental targets
    February 27, 2012
    One of the world's longest bridges is being built in Norway – for traffic volumes of just 2,000 cars/day reports Adrian Greeman. The stunning landscape of the long sea fjords in Norway is one of its glories, attracting thousands of tourists every summer. But the high mountains and deep sea inlets are also one of the great obstacles to transport and development.
  • Norway's bridge meets tough environmental targets
    May 2, 2012
    One of the world's longest bridges is being built in Norway – for traffic volumes of just 2,000 cars/day reports Adrian Greeman. The stunning landscape of the long sea fjords in Norway is one of its glories, attracting thousands of tourists every summer. But the high mountains and deep sea inlets are also one of the great obstacles to transport and development.