Skip to main content

Temporary ProLight solar lighting illuminates the UK’s A14 upgrade

The A14 Cambridge to Huntingdon improvement scheme has become the first UK project to use temporary solar - instead of diesel - lighting. The A14 is the UK’s biggest road construction project with a budget of nearly US$2 billion to upgrade 34km of trunk road between Cambridge and Huntingdon with completion set for December 2020. The A14 Integrated Delivery Team, working on behalf of project client Highways England, is the largest user in the country of year-round temporary solar trailer-transported lights.
January 9, 2019 Read time: 2 mins
Prolectric ProLight tower solar lighting with powerful LED illumiation

The A14 Cambridge to Huntingdon improvement scheme has become the first UK project to use temporary solar - instead of diesel - lighting.

The A14 is the UK’s biggest road construction project with a budget of nearly US$2 billion to upgrade 34km of trunk road between Cambridge and Huntingdon with completion set for December 2020. The A14 Integrated Delivery Team, working on behalf of project client Highways England, is the largest user in the country of year-round temporary solar trailer-transported lights.

A total of 24 Prolectric ProLight tower solar lighting with powerful LED illumination are deployed at the three compounds along the construction route, illuminating site operations.The ProLights illuminate two newly-constructed permanent roundabouts, enabling works traffic movements and site safety until permanent street lighting is introduced. Further lights are illuminating temporary bridges and laydown areas to enable safe loading and offloading of construction materials. The trailer-mounted battery capacity has been developed to be three times that of any other temporary solar trailer lights. On winter days with 16 hours of darkness the unit operates consistently.

A saving of 264,000kgs of CO2, 98,800 litres of diesel and just over €90,000 of manpower costs have been achieved in the past year. Using temporary solar lighting wherever possible will also save more than 1,000 tonnes of CO2 over the course of construction, explained David Bray, Highways England project director.

All ProLight solar units used on the A14 have been fitted with an upgrade that enables the works team to power 1800W hand-tools with the solar energy generated and stored in the light’s battery system.  

The enhancement has increased the team’s ability to reduce carbon impact, as well as removing the noise and fumes of diesel generators.

The lights are fitted with a micro-controller and GPS that enables on and off times to be controlled automatically. Power usage and carbon savings data can be monitored and recorded via a web portal.  

Although all customers have real-time web access to a remote monitoring service, Prolectric can also provide daily monitoring and control to optimise the performance of each unit, as well as regular reports of a range of performance data including carbon savings.

Related Content

  • Tarmac goes low-carbon on UK’s A64
    December 20, 2024
    The trial was delivered on a 2.4km section of England’s A64 strategic highway, the eastbound carriageway at junction 44 near the town of Bramham in North Yorkshire county.
  • Brighter for further with SolarLite 2 from Clearview Intelligence
    February 8, 2018
    Clearview Intelligence says that its SolarLite 2 active road stud features a vast number of innovations that make roads safer for all users. New ultra-bright white LEDs deliver 150% greater brightness than before, according to the company. An advanced circuit design enables more efficient power management and the latest retroreflective surface means the studs perform brilliantly even without the LED on.
  • Illuminated bollard lighting-up
    February 13, 2012
    Efficient and effective lighting is possible using the new Tornado bollard from US Architectural Lighting. This unit is said to offer a modern approach to public area lighting, along with significant energy-savings, while featuring a micro-prism lens, the unit produces a soft lighting effect.
  • The use of telematics in construction machines is growing
    May 20, 2015
    Demand for telematics technology is growing, as equipment users begin to lean the value of these systems – Alan Dron reports With construction projects increasingly operating to wafer-thin profit margins, any technological assistance that can keep the accounts in the black is welcome. This is particularly the case with those projects where contractors can share a larger slice of the profits if they complete their work ahead of schedule. The downside, of course, is that they also share the pain if the