Skip to main content

Temporary ProLight solar lighting illuminates the UK’s A14 upgrade

The A14 Cambridge to Huntingdon improvement scheme has become the first UK project to use temporary solar - instead of diesel - lighting. The A14 is the UK’s biggest road construction project with a budget of nearly US$2 billion to upgrade 34km of trunk road between Cambridge and Huntingdon with completion set for December 2020. The A14 Integrated Delivery Team, working on behalf of project client Highways England, is the largest user in the country of year-round temporary solar trailer-transported lights.
January 9, 2019 Read time: 2 mins
Prolectric ProLight tower solar lighting with powerful LED illumiation

The A14 Cambridge to Huntingdon improvement scheme has become the first UK project to use temporary solar - instead of diesel - lighting.

The A14 is the UK’s biggest road construction project with a budget of nearly US$2 billion to upgrade 34km of trunk road between Cambridge and Huntingdon with completion set for December 2020. The A14 Integrated Delivery Team, working on behalf of project client Highways England, is the largest user in the country of year-round temporary solar trailer-transported lights.

A total of 24 Prolectric ProLight tower solar lighting with powerful LED illumination are deployed at the three compounds along the construction route, illuminating site operations.The ProLights illuminate two newly-constructed permanent roundabouts, enabling works traffic movements and site safety until permanent street lighting is introduced. Further lights are illuminating temporary bridges and laydown areas to enable safe loading and offloading of construction materials. The trailer-mounted battery capacity has been developed to be three times that of any other temporary solar trailer lights. On winter days with 16 hours of darkness the unit operates consistently.

A saving of 264,000kgs of CO2, 98,800 litres of diesel and just over €90,000 of manpower costs have been achieved in the past year. Using temporary solar lighting wherever possible will also save more than 1,000 tonnes of CO2 over the course of construction, explained David Bray, Highways England project director.

All ProLight solar units used on the A14 have been fitted with an upgrade that enables the works team to power 1800W hand-tools with the solar energy generated and stored in the light’s battery system.  

The enhancement has increased the team’s ability to reduce carbon impact, as well as removing the noise and fumes of diesel generators.

The lights are fitted with a micro-controller and GPS that enables on and off times to be controlled automatically. Power usage and carbon savings data can be monitored and recorded via a web portal.  

Although all customers have real-time web access to a remote monitoring service, Prolectric can also provide daily monitoring and control to optimise the performance of each unit, as well as regular reports of a range of performance data including carbon savings.

Related Content

  • New generator power systems
    August 10, 2022
    New power generation systems are now coming to market that offer lower emissions and cleaner options for customers. Engine technology has improved enormously in recent years, with exhaust emissions from industrial diesels having been reduced significantly. Meanwhile, manufacturers have also introduced new systems that can further reduce emissions while retaining output and performance.
  • Two steps ahead: the Vögele Dash 5 road pavers
    April 1, 2023
    Road construction companies are equipped for the future with Vögele’s latest-generation SUPER 1900-5(i) and SUPER 2100-5(i) Road Pavers and AB 500 and AB 600 Extending Screeds. Highway Class pavers are perfectly at home whether on highways or handling other demanding large-scale projects. The SUPER 1900-5(i) manages pave widths between 2.55 m and 11.5 m, the SUPER 2100-5(i) up to 14 m. Both Dash 5 pavers are convincing products featuring a flexible, modular system which takes particular account of economy and sustainability as well as of ease of use and process automation.
  • Swarco and SRL team up in a deal for VMS units
    July 3, 2019
    UK-based SRL Traffic Systems has purchased 100 mobile variable message signs from Swarco under an agreement to boost the fleet to 500 rental units. The value of the deal at around US$2.9 million is a significant development for the UK market, said Swarco. SRL is also a manufacturer of portable and temporary traffic lights. The solar-powered signs are equipped with energy efficient LEDs capable of displaying full-colour text and images with no restrictions. SRL will be managing the signs via Swarco’s in
  • Solar roads such as Colas’s Wattway could be the right way
    April 26, 2016
    Peter Harrop, chairman of independent research and consultancy IDTechEx, considers arguments in favour of solar roads Nowadays a major trend is the move to off-grid clean energy created by “energy harvesting” to produce electricity where it is needed. This is more controllable and increasingly at lower cost than grid power or diesel gensets, cleaner, and often less subject to interruption. It is taking new forms as revealed in the IDTechEx Research report, “High Power Energy Harvesting 2016-2026”.