Skip to main content

Temporary ProLight solar lighting illuminates the UK’s A14 upgrade

The A14 Cambridge to Huntingdon improvement scheme has become the first UK project to use temporary solar - instead of diesel - lighting. The A14 is the UK’s biggest road construction project with a budget of nearly US$2 billion to upgrade 34km of trunk road between Cambridge and Huntingdon with completion set for December 2020. The A14 Integrated Delivery Team, working on behalf of project client Highways England, is the largest user in the country of year-round temporary solar trailer-transported lights.
January 9, 2019 Read time: 2 mins
Prolectric ProLight tower solar lighting with powerful LED illumiation

The A14 Cambridge to Huntingdon improvement scheme has become the first UK project to use temporary solar - instead of diesel - lighting.

The A14 is the UK’s biggest road construction project with a budget of nearly US$2 billion to upgrade 34km of trunk road between Cambridge and Huntingdon with completion set for December 2020. The A14 Integrated Delivery Team, working on behalf of project client Highways England, is the largest user in the country of year-round temporary solar trailer-transported lights.

A total of 24 Prolectric ProLight tower solar lighting with powerful LED illumination are deployed at the three compounds along the construction route, illuminating site operations.The ProLights illuminate two newly-constructed permanent roundabouts, enabling works traffic movements and site safety until permanent street lighting is introduced. Further lights are illuminating temporary bridges and laydown areas to enable safe loading and offloading of construction materials. The trailer-mounted battery capacity has been developed to be three times that of any other temporary solar trailer lights. On winter days with 16 hours of darkness the unit operates consistently.

A saving of 264,000kgs of CO2, 98,800 litres of diesel and just over €90,000 of manpower costs have been achieved in the past year. Using temporary solar lighting wherever possible will also save more than 1,000 tonnes of CO2 over the course of construction, explained David Bray, Highways England project director.

All ProLight solar units used on the A14 have been fitted with an upgrade that enables the works team to power 1800W hand-tools with the solar energy generated and stored in the light’s battery system.  

The enhancement has increased the team’s ability to reduce carbon impact, as well as removing the noise and fumes of diesel generators.

The lights are fitted with a micro-controller and GPS that enables on and off times to be controlled automatically. Power usage and carbon savings data can be monitored and recorded via a web portal.  

Although all customers have real-time web access to a remote monitoring service, Prolectric can also provide daily monitoring and control to optimise the performance of each unit, as well as regular reports of a range of performance data including carbon savings.

Related Content

  • Wirtgen machines at Beijing’s new airport
    June 10, 2019
    Slipform pavers from Wirtgen have played important roles for the Beijing New International Airport project. The four Wirtgen slipform pavers have been used for the construction of the apron area for the new Chinese airport.
  • Innovative project for producing fuel from microbes
    January 23, 2013
    An innovative project in the UK is aimed at replicating photosynthesis in a bid to produce biofuels. This project is being carried out by a team at the University of East Anglia (UEA), with assistance from the University of Cambridge and the University of Leeds. The intention is to find a simple and efficient process for producing hydrogen, with funding coming from the UK’s Biotechnology and Biological Sciences research council. The hydrogen produced using this technology then be used either as a fuel for i
  • Mersey Gateway shortlisted for the UK’s CIEEM ecology award
    June 1, 2017
    The team building the Mersey Gateway bridge has reached the final of a UK national competition that recognises excellence in ecology and environmental management. The project team entered this year’s Chartered Institute of Ecology and Environmental Management (CIEEM) Best Practice awards. The winners highlight outstanding examples of environmental management on large-scale projects.
  • Chinese-built Liebherr excavators
    February 8, 2018
    The first Chinese-built Liebherr R 922 crawler excavators for low regulated markets are now operating in China. The firm has developed three machines weighing from 20-25 tonnes specifically for customers in low regulated markets. The R 922 crawler excavator sits in the middle of this three-model range, which also includes the R 920 and R 924, and one of the first units from the series is being used for earthmoving work in China. The machine meets the Stage IIIA/ Tier 3/CHINA III emissions, which allows it