Skip to main content

SwiftGate for Pennsylvania Turnpike

The Tuscarora Mountain Tunnel consists of individual two-lane highway tunnels through the Tuscarora Mountain between Huntingdon and Franklin Counties in rural Pennsylvania. Each tunnel is around 1.6km long with portal buildings at each end. As part of a rehabilitation project, Versilis, based in Quebec, Canada, was selected by the Pennsylvania Turnpike Commission to supply a permanent automated lane closure system at each tunnel approach.
October 19, 2020 Read time: 2 mins
Two series of SwiftGate HSG-18CW automated gate systems facilitate the lane shifts during lane closure in the Tuscarora Mountain Tunnel

Tunnel closure using standard maintenance of traffic procedures can take up to 45 minutes or 90 minutes to open and close. This reduces the night-time work window. The solution was to install two series of SwiftGate HSG-18CW automated gate systems - 38 gates in all – to facilitate the lane shifts required as part of tunnel closures.

A taper of automated gates is deployed in less than five minutes. The gate system can be operated locally using the Versilis RF Handheld Remote Control or remotely using the Versilis web page. Full integration of the gates within the tunnel SCADA traffic management centre system is underway as part of another project. The Versilis SwiftGate HSG-18CW is crash-tested to NCHRP-350 requirements. Each gate has a very narrow mechanism footprint, allowing installation on a narrow median barrier wall.

Gate arms offer increased visibility in order to send a clear message to motorists that an access is closed. The Versilis communication hardware allows different operation and monitoring options as well as easy integration into a traffic management centre system using NTCIP protocol.

For more information on companies in this article

Related Content

  • Managing urban motorway complexity in Sydney
    October 4, 2012
    Sydney’s Hills M2 motorway is being widened while still carrying traffic and meeting tough environmental criteria More than 100,000 vehicles and over 27,000 bus commuters use the Hills M2 motorway on a typical workday, making it one of Sydney’s busiest motorway corridors. Owned and managed by Hills Motorway Ltd (HML) and a key part of the city’s orbital motorway network, the road stretches over 21km, providing a seamless link between the Lane Cove Tunnel and Westlink M7. The Hills M2 Upgrade is one of many
  • The era of workzone data
    July 4, 2018
    Portable work zone messaging is now integral - not an add-on - when it comes to safety on large-scale highway projects. Andrew Williams* reports. Portable work zone ITS solutions have emerged in recent years as important flexible tools for managing major roadwork projects, from new-build to upgrades. They effectively ensure traffic disruption is kept to a minimum and lives can be saved. As such, the technology forms a central component of a major €1.7 billion project in the southern English county of Cambr
  • Go with the flow with TrafFix Devices' Water Wall
    April 15, 2025
    TrafFix Devices says that its Water Wall barrier, made from durable low-density polyethylene plastic, is ideal for longevity and resistant to cracks and breakage.
  • Advances in tunneling machines coming to market
    November 19, 2015
    A diverse array of new tunnelling technologies will help boost productivity and cut project costs, while boosting quality - Mike Woof writes The worldwide market for tunnelling projects continues to be strong, with a series of major projects underway or planned for the future. These good market conditions have helped fuel research and development in new tunnelling equipment, designed to be more productive, more efficient and more reliable and able to deliver a higher quality of work. Drilling and blas