Skip to main content

SwiftGate for Pennsylvania Turnpike

The Tuscarora Mountain Tunnel consists of individual two-lane highway tunnels through the Tuscarora Mountain between Huntingdon and Franklin Counties in rural Pennsylvania. Each tunnel is around 1.6km long with portal buildings at each end. As part of a rehabilitation project, Versilis, based in Quebec, Canada, was selected by the Pennsylvania Turnpike Commission to supply a permanent automated lane closure system at each tunnel approach.
October 19, 2020 Read time: 2 mins
Two series of SwiftGate HSG-18CW automated gate systems facilitate the lane shifts during lane closure in the Tuscarora Mountain Tunnel

Tunnel closure using standard maintenance of traffic procedures can take up to 45 minutes or 90 minutes to open and close. This reduces the night-time work window. The solution was to install two series of SwiftGate HSG-18CW automated gate systems - 38 gates in all – to facilitate the lane shifts required as part of tunnel closures.

A taper of automated gates is deployed in less than five minutes. The gate system can be operated locally using the Versilis RF Handheld Remote Control or remotely using the Versilis web page. Full integration of the gates within the tunnel SCADA traffic management centre system is underway as part of another project. The Versilis SwiftGate HSG-18CW is crash-tested to NCHRP-350 requirements. Each gate has a very narrow mechanism footprint, allowing installation on a narrow median barrier wall.

Gate arms offer increased visibility in order to send a clear message to motorists that an access is closed. The Versilis communication hardware allows different operation and monitoring options as well as easy integration into a traffic management centre system using NTCIP protocol.

For more information on companies in this article

Related Content

  • Sophisticated machine telematics packages offered
    September 27, 2013
    Several of the major equipment manufacturers now offer sophisticated telematics packages fitted as standard to their machines. Caterpillar and Komatsu were amongst the leaders in this field, allowing a high level of access to a machine's systems and sub-systems for performance monitoring, maintenance management and geofencing purposes for example. To the customer this offers the chance to address fleet running costs and utilisation, reduce the risk of theft and increase overall efficiency. Customers can eve
  • Specifying barriers correctly for optimum roadway safety
    April 29, 2015
    Mike Dreznes, executive vice president at the International Road Federation (IRF) discusses the proper utilisation of longitudinal barriers as a road safety priority Road authorities have a duty of care to ensure infrastructure not only meets safety requirements but provides protection for all road users. Crash barriers play an essential role in maximising safety, lowering the risk of sudden impact for road users and also allowing redirective capabilities.
  • Specifying barriers correctly for optimum roadway safety
    April 29, 2015
    Mike Dreznes, executive vice president at the International Road Federation (IRF) discusses the proper utilisation of longitudinal barriers as a road safety priority Road authorities have a duty of care to ensure infrastructure not only meets safety requirements but provides protection for all road users. Crash barriers play an essential role in maximising safety, lowering the risk of sudden impact for road users and also allowing redirective capabilities. If a road authority has a rigid hazard locate
  • Ageing Liberty Tunnels in US refurbished with hydrodemolition
    May 13, 2015
    Hydrodemolition surface preparation keeps Liberty Tunnel rehabilitation project on schedule in Pittsburgh. The Pennsylvania state Department of Transportation selected hydrodemolition surface preparation for the US$18.8 million rehabilitation of Pittsburgh’s Liberty Tunnels. Time was of the essence to complete the project on deadline without penalties and hydrodemolition was selected as it offered a fast and cost-effective method to prepare the tunnel walls for a new, shotcrete surface. This methods off