Skip to main content

SWARCO sets up live-lane in Germany

SWARCO has installed a temporary hard shoulder clearance, or live-lane running system, on the A8 motorway in south-west Germany for the Die Autobahn highways agency.
May 4, 2023 Read time: 2 mins
The set-up consists of four display cross-sections with LED variable VMS, eight pole installations for VMS or camera technology as well as 12 route stations (image courtesy Autobahn GmbH Niederlassung Südwest)

The A8 motorway is an important central east-west link in the European transport network. The section between Karlsruhe motorway interchange and Karlsbad junction features a winding route and gradients of around 7.5% and is highly congested with
about 110,000 vehicles per day. Traffic flow is often blocked in this section due to slow-moving trucks and there are frequent overtaking manoeuvres and lane changes taking place.

SWARCO’s system spans 2.8km along the motorway between Karlsruhe and Karlsbad. It consists of four display cross-sections with LED variable message signs (VMS), eight pole installations for VMS or camera technology as well as 12 route stations. In addition to the outdoor equipment, SWARCO also provides central control software.

The camera technology is from Fuunkwerke video systeme while the operation of all functions is managed by the Autobahn GmbH traffic control centre in Stuttgart. Before the hard shoulder lane becomes a live-lane, it must be checked by the traffic control centre to ensure that no obstacles are blocking the lane.

SWARCO says that the system offers a climate- and resource-friendly possibility for using existing infrastructure more effectively without the need for costly and more permanent expansion of that infrastructure. In fact, notes SWARCO, the capacity of the infrastructure can increase up to 30% with such a system. The first live-lane running took place in early December 2022.

For more information on companies in this article

Related Content

  • Lindsay argues the case for reversible lanes over adding lanes
    June 26, 2018
    Build new lanes or use existing lanes more effectively? In a recent US study* commissioned by Lindsay Transportation Solutions, the company argues the case for reversible lanes. The level of future uncertainty in transportation planning - specifically in addressing congestion on urban freeways - has increased significantly over the past few years. The impact of connected and autonomous vehicles on traffic flow, of Mobility as a Service (MaaS) initiatives, particularly the car-sharing elements, and exciting
  • Telent pick up more UK ITS deals for traffic management
    June 10, 2019
    Telent Technology Services has been awarded a major eight-year traffic signals and ITS maintenance contract for England’s Essex county. The award was given to Telent, a UK-based company, by the contractor Ringway Jacobs on behalf of the Essex Highways Partnership. The deal will include maintenance of 231 traffic signal junctions, 262 traffic signal crossings, four emergency wig-wag lights, 30 car park count sites, 48 car park guidance Variable Message Signs (VMS), 17 vehicle actuated signs and 398 school
  • New Zealand’s Waterview project is moving closer to completion
    December 13, 2016
    New Zealand’s biggest road project is less than a year away from completion, and a lot of progress has been made since World Highways last looked at the project two years ago - Mary Searle Bell reports New Zealand’s Waterview project is moving closer to completion and will be the largest road project in the country. The NZ$2 billion Western Ring Route will see the creation of an alternative motorway to State Highway 1, which runs through the centre of Auckland. The 47km-long motorway will allow a large p
  • Delta Bloc solution for major upgrade to UK’s M6 motorway
    February 8, 2018
    Delta Bloc’s structural precast concrete barriers have been supplied for a €308 million smart motorway project being undertaken by Highways England on the M6 Motorway. UK contractor Charcon Construction Solutions worked with Delta Bloc UK, which develops, manufactures, supplies and installs permanent and temporary concrete road safety barriers. The Highways England scheme between junction 16 at Crewe and junction 19 at Knutsford has seen a new 32km concrete safety barrier installed in the central reservat