Skip to main content

Swarco gains entrance to Cambridge University with its TTC-3 system

Traffic control technology from Swarco Traffic has been installed at the University of Cambridge in England during major construction work on campus. Swarco’s ITC-3 system control heavy vehicle and plant traffic movements while a major two-year building project at the university’s Civil Engineering Department is being undertaken by a local construction firm.
May 18, 2018 Read time: 2 mins
Swarco’s modular ITC-3 is easily configurable
Traffic control technology from 337 Swarco Traffic has been installed at the University of Cambridge in England during major construction work on campus. Swarco’s ITC-3 system control heavy vehicle and plant traffic movements while a major two-year building project at the university’s Civil Engineering Department is being undertaken by a local construction firm.


The contractor was looking for a solution that was less expensive and more practical than temporary traffic lights and opted for permanent lights to work as a shuttle system. Crucial was a reliable method of controlling the lights to manage traffic movements automatically and safely - especially with a manual all-red override when required. The modular ITC-3 is easily configurable to suit a range of traffic management applications, according to the company. It can be directly connected to similarly diverse types of control and monitoring systems.

It also meets UK and International standards and is available as extra-low voltage and low voltage and can be delivered in two sizes, depending on the number of signal phases required. For pedestrian control and small intersections, a version with six phases and up to 16 detectors is available. For most intersections, the 3U rack with up to 24 phases and 40 detectors is required.

For more information on companies in this article

Related Content

  • SWARCO helps cut congestion at Dover Port and local roads
    September 29, 2016
    SWARCO is playing a key role in a US$110 million traffic-management improvement scheme at the UK’s Dover Port The port handles nearly $155 billion of trade annually and saw record freight volumes of 2.53 million units in 2015, up 5% on 2014. It handles up to 17% of all UK trade so its efficient operation is essential.
  • Developments in workzone safety systems
    May 3, 2012
    Raising awareness of safety in highway work zones is a global issue, and various initiatives highlight this as Patrick Smith reports. So seriously is work zone safety taken in the United States that each year since 1999 a special week has been set aside to highlight it. Each year in April, National Work Zone Awareness Week is held to bring national attention to motorist and worker safety and mobility issues in work zones.
  • Developments in workzone safety systems
    February 8, 2012
    Raising awareness of safety in highway work zones is a global issue, and various initiatives highlight this as Patrick Smith reports. So seriously is work zone safety taken in the United States that each year since 1999 a special week has been set aside to highlight it. Each year in April, National Work Zone Awareness Week is held to bring national attention to motorist and worker safety and mobility issues in work zones.
  • New signals aimed at cycle lane use
    March 9, 2016
    SWARCO Traffic is offering a range of Mini-Signals to meet the need for street-level signals for bicycle lanes. The first signals are already being installed in the UK as part of London’s new Cycle Superhighway routes. The Mini- Signals use a bespoke LED technology that gives a high light output but consumes minimal power. The signals require next to no maintenance and are also highly reliable and durable according to the firm. Made from high-strength polycarbonate, the signals are suited to city centre a