Skip to main content

SWARCO completes installation on UK’s busiest north east highways

SWARCO has installed a network of 27 variable message signs at some of the busiest highway locations in the northern UK’s Tyneside region. The signs give motorists key information to help them plan their journey and warn them of weather disruption and other potential hazards. Planning and coordinating all works with each local authority was the major challenge, requiring some of the installations to be made in the dead of night. The city of Newcastle was the contracting local authority acting for the Nor
March 22, 2017 Read time: 2 mins
SWARCO Traffic completes overnight installations for the North East Combined Authority
337 SWARCO has installed a network of 27 variable message signs at some of the busiest highway locations in the northern UK’s Tyneside region. The signs give motorists key information to help them plan their journey and warn them of weather disruption and other potential hazards.

Planning and coordinating all works with each local authority was the major challenge, requiring some of the installations to be made in the dead of night. The city of Newcastle was the contracting local authority acting for the North East Combined Authority.

Signs were also installed in the regions and cities of Sunderland, Gateshead, North Tyneside, South Tyneside and Northumberland. Each Authority had to be consulted about the installation works in their area.

The US$1.23 million project has been met from the 5432 Department for Transport’s Local Sustainable Transport Fund. SWARCO Traffic said it had worked closely with the scheme designers to determine the best location for signs taking into account when drivers require information and need maximum visibility.

Brian McFarlane, project manager at SWARCO Traffic, pointed to a particularly challenging installation, that of a large sign on the Gateshead approach to the Redheugh Bridge crossing of the Tyne. “We had to take down the existing life-expired sign, modify the gantry superstructure and then install the new sign during overnight road closures,” he explained.

“Existing structure for the gantry had to be surveyed and new support structure engineered. Works had to be postponed until A1 bypass works had been completed with night closure of the A189 required.”

Critical to the work undertaken across the network was the need to cause minimum disruption and work around scheduled events. It also required liaising with contractors working on the A1 Western Bypass, as well as overnight closures.

SWARCO was also responsible for managing the associate civil engineering works and the installation of permanent roadside barriers. It will maintain the signs for the next seven years.

For more information on companies in this article

Related Content

  • Driving recycling, unlocking the value of UK roads
    May 16, 2016
    Concerned about the risk of material failure, many local authorities and network operators have been reluctant to incorporate high recycled content asphalt into the surface course of UK roads. David Smith, development director at FM Conway, explained why asphalt recycling is crucial to maximising the value of Britain’s largely untapped road asset.
  • Integrated corridor management offers transportation efficiency
    May 28, 2013
    In the Intelligent Transportation Systems world, the concept of managing roadway or transportation corridors is not new. Smart Corridor concepts have existed for some time, such as the Santa Monica Smart Corridor system from the 1990s. Across the world, a new emerging model for operating roadway transportation networks called integrated corridor management (ICM) has emerged. This is particularly true in California, where several new ICM projects have or are being deployed. There is a new paradigm for corrid
  • Swansea signs up Swarco
    September 14, 2023
    Swarco has signed an agreement with the Welsh city of Swansea to design and install signage to support the new 32km/h (20mph) urban speed limit.
  • Presidio Parkway: the Golden Gate Bridge’s new southern approach road
    May 29, 2013
    Work on the Presidio Parkway, a new breathtaking and eco-friendly southern approach road to San Francisco’s Golden Gate Bridge, has entered its crucial second and final phase. As Guy Woodford reports, the vital US$1 billion project has overcome legal as well as environmental challenges to stay on course for its expected 2016 completion Just after 9pm on Friday April 27, 2012 a large public crowd looked on excitedly as a fleet of more than 40 R&L Brosamer and Ferma Corporation deployed hydraulic demolition h