Skip to main content

SWARCO completes installation on UK’s busiest north east highways

SWARCO has installed a network of 27 variable message signs at some of the busiest highway locations in the northern UK’s Tyneside region. The signs give motorists key information to help them plan their journey and warn them of weather disruption and other potential hazards. Planning and coordinating all works with each local authority was the major challenge, requiring some of the installations to be made in the dead of night. The city of Newcastle was the contracting local authority acting for the Nor
March 22, 2017 Read time: 2 mins
SWARCO Traffic completes overnight installations for the North East Combined Authority
337 SWARCO has installed a network of 27 variable message signs at some of the busiest highway locations in the northern UK’s Tyneside region. The signs give motorists key information to help them plan their journey and warn them of weather disruption and other potential hazards.

Planning and coordinating all works with each local authority was the major challenge, requiring some of the installations to be made in the dead of night. The city of Newcastle was the contracting local authority acting for the North East Combined Authority.

Signs were also installed in the regions and cities of Sunderland, Gateshead, North Tyneside, South Tyneside and Northumberland. Each Authority had to be consulted about the installation works in their area.

The US$1.23 million project has been met from the 5432 Department for Transport’s Local Sustainable Transport Fund. SWARCO Traffic said it had worked closely with the scheme designers to determine the best location for signs taking into account when drivers require information and need maximum visibility.

Brian McFarlane, project manager at SWARCO Traffic, pointed to a particularly challenging installation, that of a large sign on the Gateshead approach to the Redheugh Bridge crossing of the Tyne. “We had to take down the existing life-expired sign, modify the gantry superstructure and then install the new sign during overnight road closures,” he explained.

“Existing structure for the gantry had to be surveyed and new support structure engineered. Works had to be postponed until A1 bypass works had been completed with night closure of the A189 required.”

Critical to the work undertaken across the network was the need to cause minimum disruption and work around scheduled events. It also required liaising with contractors working on the A1 Western Bypass, as well as overnight closures.

SWARCO was also responsible for managing the associate civil engineering works and the installation of permanent roadside barriers. It will maintain the signs for the next seven years.

For more information on companies in this article

Related Content

  • Fast bridge building in Tennessee
    July 5, 2016
    The Tennessee Department of Transportation (TDOT) recently completed the Fast Fix 8 bridge project in Nashville, with help from a Power Curbers slipformer belonging to Irwin Concrete Construction. TDOT’s goal was to replace eight ageing interstate bridges along Interstate 40 through Nashville using a process called Accelerated Bridge Construction (ABC). This uses fast-paced, around-the-clock work to limit road closures and speed up bridge completion, impacting surrounding communities as little as possibl
  • Workzone safety protects workforce and drivers
    May 3, 2012
    Highway construction work zones are dangerous places, and anything that can improve safety is welcomed as Patrick Smith reports. The safe and efficient flow of traffic through work zones is a major concern to transportation officials, industry, the public, businesses, and commercial motor carriers. This is the view of the US Federal Highway Administration (FHWA), which has developed the Highway Work Zone Safety Program to reduce the fatalities and injurious crashes in work zones, and to enhance traffic oper
  • Tackling the UK's traffic congestion
    February 28, 2012
    The biggest problem on UK roads is congestion, and there is no shortage of ideas as to how it should be tackled. Patrick Smith reports. Congestion (and how to relieve it), along with safety, are among the top priorities facing those responsible for looking after the UK's roads. Road pricing, car-share lanes, greener vehicle initiatives and alternative methods of transport such as buses, trams and rail are all part of the approach, but prior to the current economic climate the nation's love affair with the c
  • Focusing on workzone safety systems
    March 16, 2012
    The US has seen a major reduction in deaths following accidents in its highway construction work zones, while Europe and other parts of the world are looking at new safety technology and systems to trigger a similar trend. Guy Woodford reports. Work in the US to reduce the likelihood of potentially fatal accidents at highway work zones is paying dividend.