Skip to main content

Star performance from SMA Road Safety

The gate within the Stargate Emergency Access system can be opened in less than 30 seconds.
By David Arminas April 6, 2021 Read time: 2 mins
The gate within the Stargate Emergency Access system can be opened in less than 30 seconds

SMA Road Safety says the gate within its latest Stargate Emergency Access system is not anchored to the ground, allowing for easy and fast removal.

The 6m-long gate is the middle module of the three-module system. Adjacent modules, also 6m long, are bolted onto a specially designed sunken anchor rail. This means the anchored modules are correctly positioned and no measuring is required.

A special adjustable connection section at either end of both anchored modules allows for safe attachment to the adjoining concrete barrier. This connection section can be adjusted to fill a gap up to around 100mm between the module and concrete barrier.

When installed, the height of the barrier is 1,005mm and width is 170mm. All the modules, anchoring rail and barrier connecting units are delivered preassembled for fast and precise completion of installation.

When installed, the gate can be removed by two people in less than 30 seconds – no special tools required, says the Italian manufacturer. Each person simply lifts joining connecting pegs at each end of the gate which has integrated wheels. The gate can be quickly wheeled away to rest alongside either adjoining anchored support module. Importantly, the gate has integrated hooks that allow it to be securely slipped onto the adjoining anchored section to keep it safely out of the way.

Stargate has been tested with direct connection to ANAS NDBA concrete barrier. Properly developed and supplied by SMA, the connection allows a perfect adaptation to the concrete barrier and guarantees zero risk in case of impact.

The system has been crash tested according to the EN 1317-4 standard, with a connection to an H4b concrete barrier. SMA’s Stargate also has the CE Mark.

For more information on companies in this article

Related Content

  • Durisol barrier passes MASH TL-4 crash test
    February 23, 2021
    The aluminium noise wall barrier is prefabricated and has tongue and groove assembly.
  • Workzone safety protects workforce and drivers
    February 15, 2012
    Highway construction work zones are dangerous places, and anything that can improve safety is welcomed as Patrick Smith reports. The safe and efficient flow of traffic through work zones is a major concern to transportation officials, industry, the public, businesses, and commercial motor carriers. This is the view of the US Federal Highway Administration (FHWA), which has developed the Highway Work Zone Safety Program to reduce the fatalities and injurious crashes in work zones, and to enhance traffic oper
  • Road Markings to reduce fatal wrong-way driving
    October 31, 2012
    The latest road marking systems have been used to reduce potentially fatal wrong-way driving and promote the recent EURO 2012 football tournament in Poland and Ukraine. Guy Woodford reports According to statistics quoted by leading road marking firm Geveko, a total of 1,753 people were killed in the United States in wrong-way driving accidents from1996-2000. Wrong-way driving is also a significant issue across Europe and other parts of the world. Work to combat the potentially lethal activity took place re
  • Germany's advanced bridge construction
    February 24, 2012
    The A98 single-lane motorway in Germany is being extended by a second pair of lanes. Work began in 2007 and required building a second bridge at Rheinfelden in the south-west of the country, parallel to the existing bridge, and identical in design and construction.