Skip to main content

Star performance from SMA Road Safety

The gate within the Stargate Emergency Access system can be opened in less than 30 seconds.
By David Arminas April 6, 2021 Read time: 2 mins
The gate within the Stargate Emergency Access system can be opened in less than 30 seconds

SMA Road Safety says the gate within its latest Stargate Emergency Access system is not anchored to the ground, allowing for easy and fast removal.

The 6m-long gate is the middle module of the three-module system. Adjacent modules, also 6m long, are bolted onto a specially designed sunken anchor rail. This means the anchored modules are correctly positioned and no measuring is required.

A special adjustable connection section at either end of both anchored modules allows for safe attachment to the adjoining concrete barrier. This connection section can be adjusted to fill a gap up to around 100mm between the module and concrete barrier.

When installed, the height of the barrier is 1,005mm and width is 170mm. All the modules, anchoring rail and barrier connecting units are delivered preassembled for fast and precise completion of installation.

When installed, the gate can be removed by two people in less than 30 seconds – no special tools required, says the Italian manufacturer. Each person simply lifts joining connecting pegs at each end of the gate which has integrated wheels. The gate can be quickly wheeled away to rest alongside either adjoining anchored support module. Importantly, the gate has integrated hooks that allow it to be securely slipped onto the adjoining anchored section to keep it safely out of the way.

Stargate has been tested with direct connection to ANAS NDBA concrete barrier. Properly developed and supplied by SMA, the connection allows a perfect adaptation to the concrete barrier and guarantees zero risk in case of impact.

The system has been crash tested according to the EN 1317-4 standard, with a connection to an H4b concrete barrier. SMA’s Stargate also has the CE Mark.

For more information on companies in this article

Related Content

  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b
  • Tough competition in concrete paving market
    February 13, 2012
    One thing is clear in the concrete slipforming sector. This comparatively niche market for equipment is rapidly becoming a good deal more competitive as key manufacturers jostle for position.
  • Italy's strategic tunnel link
    August 21, 2012
    The world's largest tunnelling machine is completing Italy's important road connection between Bologna and Florence - Adrian Greeman reports For just under a decade a huge programme of highway construction has been underway in the mountainous region between Bologna and Florence, realigning a section of the A1 highway nearly 70km long. The new section, through major tunnels and across high viaducts, will greatly increase capacity on Italy's most important highway.
  • Eradicating work zone danger
    June 26, 2013
    New safety systems for highway work zones are helping to reduce deaths and injuries in the United States, while much work is being done in Europe to improve work zone safety. Guy Woodford reports. With more road building underway than at any one time in Texas history, the US Lone Star state’s Department of Transportation (TxDOT) is introducing its first highway safety system with queue-warning technology and temporary rumble strips to cut work zone collisions. Debuting along a central Texas stretch of the