Skip to main content

SolarLite production fully back in the UK

Clearview Intelligence has been working with Adapt EMS, a contract electronics manufacturer, to successfully bring production of the SolarLite Road Stud back into the UK.
June 12, 2020 Read time: 2 mins
Clearview teams up with Adapt EMS for UK SolarLite production

Since 1996 when the first SolarLite was installed in the UK’s roads, Clearview developed and produced what it claims is the most reliable solar-powered LED road stud to improve road safety across the national road network.

In 2014 Clearview received investment from the Advanced Manufacturing Supply Chain Initiative with the aim of bringing together UK-based companies to repatriate production of the SolarLite stud. The move was to allow easier research and development work and to encourage closer quality control relationships with manufacturers of components.

Adapt EMS has set up a manufacturing facility in the company’s factory in the town of Hitchin, near London. Product materials are now sourced through a UK supply chain to build new versions of the stud and to ensure quality is of the highest standard, according to Nick Lanigan, managing director of Clearview Intelligence and lead for the project.

“It’s been a long-term aim for us to re-shore the SolarLite production process and the Supply Chain Iniatitive funding was central to successfully do this,” said Lanigan. “Adapt EMS has come on board as our new manufacturing partner and they have proven their willingness and flexibility to work alongside us and achieve the very high standards we demanded.”

Alongside manufacturing, quality control and fulfilment processes include automated PC testing and 3D AOI technology.

Clearview Intelligence delivers innovative solutions that harness data intelligence and analytics platforms. Adapt EMS was set up in 1985 as a private contract electronics manufacturer serving customers in a variety of high-tech sectors. Products manufactured in accordance with the ISO13485 European quality standard. Customers are supported with all their manufacturing requirements from fast-turn prototyping, including 3D printing, to volume production of PCB assemblies and full product build.

For more information on companies in this article

Related Content

  • Clearview’s SolarLite road studs light for the long term on Guernsey
    May 10, 2019
    The number of drivers feeling safe travelling along two of Guernsey’s key roads has more than doubled following the installation of solar powered road studs. In response to driver concerns about navigating unlit, narrow coastal roads after dark, Clearview Intelligence’s SolarLite Active Road Studs were installed along the La Neuve Rue at Albecq and Route de la Lague/ Route de Rocquaine at Fort Grey. Traditional retro reflective studs are reliant upon a vehicle headlight beam to be seen up to 90m away.
  • Advances in asphalt plant production
    November 27, 2012
    Leading asphalt plant manufacturers have recently unveiled their latest products aimed at customers looking for significant efficiency gains through the use of durable and lasting technology. Guy Woodford looks at some of the new batch Benninghoven showcased a wide variety of its new and innovative asphalt plants and individual plant components during its week-long Open Days event last month at the German firm’s HQ in Mülheim. Launched earlier this year, the MMX80 Continuous Asphalt Plant is capable of prod
  • Asecap Days – Istanbul 2023
    February 16, 2024
    The “vast lakes of data” collected daily by global highway operators are going to waste meaning opportunities to improve services and boost revenue are continually lost. This must change, reports Geoff Hadwick from the ASECAP Days 2023 conference in Istanbul.
  • Cats eyes from Clearview set the tone at Switch Island in the UK
    February 23, 2018
    Cats eyes, which light up in response to changing traffic lights, will be used for the first time in the UK at a motorway junction. Highways England, the government agency, is installing around 170 of the LED road studs at Switch Island, one of England’s busiest motorway junctions – used by over 90,000 vehicles every day. Installation is expected to take around a year to complete.