Skip to main content

Siemens unveils passively safe traffic-signal poles

Siemens has unveiled a range of passively safe traffic signal poles that are performance-rated against BS EN 12767 They come in a wide variety of forms, finish and lengths from 2-6m, said Keith Manston, head of product management for Siemens. The poles are CE marked with a specification label confirming key features as required by BS EN 12899 including construction material, corrosion resistance and strength characteristics.
March 12, 2018 Read time: 2 mins
Siemens supports the bright lights with new passively safe traffic signal poles
Siemens has unveiled a range of passively safe traffic signal poles that are performance-rated against BS EN 12767


They come in a wide variety of forms, finish and lengths from 2-6m, said Keith Manston, head of product management for 1134 Siemens. The poles are CE marked with a specification label confirming key features as required by BS EN 12899 including construction material, corrosion resistance and strength characteristics.

“Siemens conducted extensive wind tunnel testing to evaluate real loads experienced by traffic signals poles when fully equipped,” said Manston. “Each pole has been characterised to ensure it is not overloaded either during initial installation or as part of a typical junction improvement.”

The aluminium construction makes them up to 50% lighter than the equivalent steel pole, improving health and safety by considerably easing installation. Varieties include straight poles and ‘cranked’ poles that are typically used at pedestrian crossings.

They’re mid-level termination design maintains a standard 114mm mounting diameter over the whole pole length. They come in a variety of colours including black, grey and silver finish.

For more information on companies in this article

Related Content

  • Advances in asphalt paving equipment coming to market
    June 27, 2018
    Some of the key manufacturers are improving asphalt paving technology with key developments to machines as well as the electronics and telematics systems fitted – Mike Woof writes. Several of the major asphalt paver manufacturers have unveiled new machines and systems that can optimise operations. Improved operating features for the BOMAG BF 800 C-2 paver are said to help increase its output and efficiency when working on-site. An important development is the new traffic light system, which helps improve co
  • Rebuilding the busy Frankfurt Airport in Germany
    September 12, 2017
    Handling up to 450 take-offs/day, Runway West is Frankfurt Airport’s busiest runway. Over 50% of the aircraft taking off from the airport uses Runway West, and a point worth noting is that this German airport is one of the busiest in Europe. In 2016, Frankfurt Airport handled nearly 61 million passengers, surpassed by Schiphol in Amsterdam and Charles de Gaulle in Paris, Europe’s third and second busiest airports respectively. Meanwhile London’s Heathrow remained Europe’s busiest airport
  • Rebuilding the busy Frankfurt Airport in Germany
    September 12, 2017
    Handling up to 450 take-offs/day, Runway West is Frankfurt Airport’s busiest runway. Over 50% of the aircraft taking off from the airport uses Runway West, and a point worth noting is that this German airport is one of the busiest in Europe. In 2016, Frankfurt Airport handled nearly 61 million passengers, surpassed by Schiphol in Amsterdam and Charles de Gaulle in Paris, Europe’s third and second busiest airports respectively. Meanwhile London’s Heathrow remained Europe’s busiest airport
  • Itinera wins Sweden’s Skurusunds Bridge near Stockholm
    January 21, 2019
    Italian contractor Itinera will build the new 99m-long and 31m-wide Skurusunds Bridge near Stockholm in Sweden. Trafikverket, the Swedish transport administration, awarded the €75 million contract to Itinera, part of Gruppo Gavio. The new bridge will be parallel to the existing bridge which will remain. It handles around 52,000 vehicles daily, many of them commuting to and from Stockholm. Work will include improvements to traffic junctions at Skuru and Björknäs. The four-lane steel bridge will have