Skip to main content

Siemens refurb signals savings

Major refurbishment of traffic technology across Medway, part of the Thames Gateway area, is underway to significantly reduce energy and communications costs with newly-developed products from Siemens.Aimed at reducing carbon emissions and power consumption, the project near London, involves replacing over 600 signal heads with new Siemens retrofit technology at sites in Rainham, Rochester, Gillingham and Chatham. Communications equipment is also being upgraded with the deployment of new UG405 outstation tr
February 6, 2012 Read time: 2 mins
Major refurbishment of traffic technology across Medway, part of the Thames Gateway area, is underway to significantly reduce energy and communications costs with newly-developed products from 1134 Siemens.

Aimed at reducing carbon emissions and power consumption, the project near London, involves replacing over 600 signal heads with new Siemens retrofit technology at sites in Rainham, Rochester, Gillingham and Chatham. Communications equipment is also being upgraded with the deployment of new UG405 outstation transmission units (OTUs) from Siemens.

According to Alan Hawker, Medway's traffic signal engineer, the unitary authority plans a major shift towards Extra Low Voltage (ELV) technology over the next year.

"ELV from Siemens will make a significant contribution not just in reduced power consumption but also ongoing maintenance. We have even looked at how much time is taken up travelling with a vehicle to replace a lamp or attend a lamp failure: this is a green issue too," he said.

In addition to ELV technology, Siemens low-power Helios retrofit enables both existing Siemens Helios and Peek Elite signal equipment throughout Medway to be upgraded to the latest CLS LED technology, while maximising the reuse of existing roadside infrastructure.

The refurbishment project includes a new UTMC database, car park guidance systems, VMS signage and migration to IP-based communications network and the latest UG405 communications protocol. Allowing traffic technology to use the existing council network which links offices, schools and libraries is calculated to deliver significant communications cost savings for Medway as well as deliver improvements to the existing Urban Traffic Control (UTC) network.

With a total of 210 junctions including crossings, the project also involves the installation of new ELV controllers at over 50 sites, upgrading existing controllers to drive LED signals, Telscan CCTV cameras from Siemens at almost 40 locations and the conversion of more than 100 sites to LED.

Offering power and carbon savings of over 75%, the retrofit modules fit existing traffic signal bodies, minimising waste and disposal issues, and further enhancing the carbon savings achieved. Completion is scheduled for March 2011.

For more information on companies in this article

Related Content

  • Sorting out site comms
    August 9, 2021
    With the radio spectrum quickly filling up, signal congestion can hinder reliability and site communications. Darren Hudson, senior projects manager of Traffic Group Signals in the UK, explains
  • Bitumen technology suppliers seek new ways to save money and work more efficiently
    April 24, 2013
    When World Highways decided to ask some of the industry’s leading suppliers what the future holds for bitumen, we found out - not surprisingly in the current economic climate - that it’s all about saving money. Kristina Smith reports. How quickly the tide turns. Just two years ago, saving carbon and the planet was moving up many countries’ political agendas. Now politicians in Europe and beyond have been forced to park commitments in the face of economic austerity. “The big issue with local government is th
  • Temporary ProLight solar lighting illuminates the UK’s A14 upgrade
    January 9, 2019
    The A14 Cambridge to Huntingdon improvement scheme has become the first UK project to use temporary solar - instead of diesel - lighting. The A14 is the UK’s biggest road construction project with a budget of nearly US$2 billion to upgrade 34km of trunk road between Cambridge and Huntingdon with completion set for December 2020. The A14 Integrated Delivery Team, working on behalf of project client Highways England, is the largest user in the country of year-round temporary solar trailer-transported lights.
  • A fresh breath of air
    July 16, 2012
    With a new wave of exhaust emission regulations coming shortly, engine manufacturers are well on track to develop new solutions as Mike Woof reports A wave of technological advances has made the current generation of diesels the cleanest industrial engines ever produced. Driven by tightening controls on emissions, manufacturers have had to develop an array of innovative solutions that will help cut particulate and NOx being emitted from the tailpipe. When the phased reduction in exhaust emissions was first