Skip to main content

Siemens refurb signals savings

Major refurbishment of traffic technology across Medway, part of the Thames Gateway area, is underway to significantly reduce energy and communications costs with newly-developed products from Siemens.Aimed at reducing carbon emissions and power consumption, the project near London, involves replacing over 600 signal heads with new Siemens retrofit technology at sites in Rainham, Rochester, Gillingham and Chatham. Communications equipment is also being upgraded with the deployment of new UG405 outstation tr
February 6, 2012 Read time: 2 mins
Major refurbishment of traffic technology across Medway, part of the Thames Gateway area, is underway to significantly reduce energy and communications costs with newly-developed products from 1134 Siemens.

Aimed at reducing carbon emissions and power consumption, the project near London, involves replacing over 600 signal heads with new Siemens retrofit technology at sites in Rainham, Rochester, Gillingham and Chatham. Communications equipment is also being upgraded with the deployment of new UG405 outstation transmission units (OTUs) from Siemens.

According to Alan Hawker, Medway's traffic signal engineer, the unitary authority plans a major shift towards Extra Low Voltage (ELV) technology over the next year.

"ELV from Siemens will make a significant contribution not just in reduced power consumption but also ongoing maintenance. We have even looked at how much time is taken up travelling with a vehicle to replace a lamp or attend a lamp failure: this is a green issue too," he said.

In addition to ELV technology, Siemens low-power Helios retrofit enables both existing Siemens Helios and Peek Elite signal equipment throughout Medway to be upgraded to the latest CLS LED technology, while maximising the reuse of existing roadside infrastructure.

The refurbishment project includes a new UTMC database, car park guidance systems, VMS signage and migration to IP-based communications network and the latest UG405 communications protocol. Allowing traffic technology to use the existing council network which links offices, schools and libraries is calculated to deliver significant communications cost savings for Medway as well as deliver improvements to the existing Urban Traffic Control (UTC) network.

With a total of 210 junctions including crossings, the project also involves the installation of new ELV controllers at over 50 sites, upgrading existing controllers to drive LED signals, Telscan CCTV cameras from Siemens at almost 40 locations and the conversion of more than 100 sites to LED.

Offering power and carbon savings of over 75%, the retrofit modules fit existing traffic signal bodies, minimising waste and disposal issues, and further enhancing the carbon savings achieved. Completion is scheduled for March 2011.

For more information on companies in this article

Related Content

  • Caterpillar C series articulated dump trucks move with the times
    May 19, 2015
    Caterpillar has raised the bar for articulated dump truck performance with the introduction of its C Series to replace its B series ADTs. All the new Cat 735C, 740C EJ and 745C ADTs have engines that meet US EPA Tier 4 Final/EU Stage IV emissions standards. The machines also incorporate many new and upgraded features designed to boost the operator’s efficiency, ensure a longer life cycle of the vehicle and save fuel. Rated payload capacities for the new models are 32.7tonnes for the 735C, 38tonnes for the 7
  • Developments in excavators and loaders
    February 14, 2012
    In the earthmoving sector, much development is being seen in excavators and wheeled loaders used for digging and loading, Mike Woof reports
  • Minister gives green light for UK road schemes
    May 8, 2012
    Roads Minister Mike Penning yesterday gave the green light for development work to be carried out on six new major UK road schemes. The development work, which will take place over the next three years, aims to prime the road schemes for completion in the early years of the next spending review period (post 2015). The six proposed road schemes, which aim to boost economic growth as part of the Government’s National Infrastructure Plan, are:
  • Benninghoven | Reducing the carbon footprint in asphalt production
    May 5, 2023
    Working more efficiently with sustainable and economical technologies is the challenge of today and tomorrow. Solutions from Benninghoven lower emissions and secure the future of asphalt mixing plant sites.