Skip to main content

Siemens cuts through traffic

Siemens has launched an alternative traffic detection system that uses magnetic disturbances to detect vehicles and low power wireless technology to transmit data to host controllers. According to Siemens head of product management Keith Manston, the WiMag system offers a cost effective detection system for stopline, vehicle actuation, SCOOT and MOVA applications. “Using a battery-powered wireless magnetometer sensor which lies beneath the surface of the road, the WiMag system utilises disturbances in the e
October 31, 2012 Read time: 2 mins

Siemens has launched an alternative traffic detection system that uses magnetic disturbances to detect vehicles and low power wireless technology to transmit data to host controllers.

According to 1134 Siemens head of product management Keith Manston, the WiMag system offers a cost effective detection system for stopline, vehicle actuation, SCOOT and MOVA applications. “Using a battery-powered wireless magnetometer sensor which lies beneath the surface of the road, the WiMag system utilises disturbances in the earth’s magnetic field to detect passing and stationary vehicles, and relays the information to the traffic controller without the need for expensive cabling or duct works,’ said Manston.

For new sites in particular, the WiMag system is said to offer a more cost effective and flexible solution than installing traditional loop detectors, especially where detection is required at significant distances from the traffic controller. Being battery-powered, wirelessly linked and smaller in size than traditional loop detectors, WiMag is also said by Siemens to lend itself to installation at remote locations, as well as being less prone to damage by street works.

With an inbuilt low-power wireless transmitter/receiver and a dedicated battery, each sensor can detect and transmit data to an associated Access Point or battery-powered repeater unit. Simply installed in the carriageway as a loop equivalent device, the in-road sensors may be located up to 300m from the host controller, using repeater units where necessary.

For more information on companies in this article

Related Content

  • Intelligent bulldozers provide productivity boost
    September 27, 2013
    New smart dozers provide faster working and greater efficiency - Mike Woof reports Both Caterpillar and Komatsu are making key moves in offering intelligent bulldozing capabilities on their latest machines. In the medium-sized bulldozer market, both companies have sophisticated new models that will increase both productivity and finish quality, while lowering running costs for the user.
  • Rapid adoption of GPS machine control
    April 5, 2012
    The high sophistication of GPS machine control systems has resulted in a fast pace of technological advancement. The three major players in the machine control sector, Leica Geosystems, Topcon and Trimble have all made major gains in recent years. The sophistication of the latest systems can combine satellite position data from the GPS and GLONASS networks with information from total stations to provide precise, high speed machine operation. Further more the firms have also prepared themselves for the intro
  • Road savvy WIM prolongs highways and saves nations vital cash
    May 28, 2013
    A leading WIM system manufacturer is playing a key role in efforts to reduce the number of overloaded trucks costing developing economies around the world billions of dollars in accidents and damage to roads, while another company has won a major contract in South America. Guy Woodford reports. The prevalence of overloaded trucks on the road networks of developing countries and the accidents and structural damage they cause wastes valuable, limited resources in some of the world’s poorest economies, diverti
  • New Turkish bridge opens to traffic
    June 30, 2016
    Turkey’s new Osman Gazi Bridge has now opened for traffic. This bridge can carry 40,000 vehicles/day, while halving the travel time needed using previous routes. This is a six lane suspension bridge measuring 3km and spanning the Sea of Marmara. Construction has taken 42 months and the structure has been designed to cope with the risk of earthquakes. The project has been co-ordinated by Japanese construction company IHI, with Siemens handling the role of electro and mechanical contractor. Siemens has dev