Skip to main content

Shorter queues with SRL's Multiphase ADS

Multiphase ADS – adaptive detection system - was modelled by Ian Routledge Consultancy.
By David Arminas August 24, 2021 Read time: 3 mins
Multiphase ADS uses an algorithm to adjust green light time, taking into account the accommodation of HGV start lag

SRL Traffic Systems claims that its traffic light detection system Multiphase ADS  “has been independently proven to reduce average queue lengths by 50 per cent”.

SRL Traffic Systems, a manufacturer and supplier of mobile intelligent transport system equipment, says its Multiphase ADS – adaptive detection system - was independently modelled by Ian Routledge Consultancy. The manufacturers says that it is the only portable and temporary traffic detection solution to have been independently modelled.
 
The modelling used traffic flow data and Vissim with three-way control in a heavily saturated tidal flow location in Yorkshire, England. It demonstrated that the impact of replacing a basic logic traffic light system with Multiphase ADS can be a reduction in average queue length of 50 per cent.

There was also a  reduction in maximum queue length of 29 per cent;  a reduction in average journey time at the junction of 22 per cent, increasing to 40 per cent during peak flow; and a reduction in journey time for the route with the highest flow of traffic of 52 per cent.

SRL, based in Manchester, England, launched Multiphase ADS traffic light detection technology at the end of last year and it may be used in conjunction with the Eurolight Master temporary and portable traffic lights. Multiphase ADS is the only portable and temporary ADS solution to offer two, three and four-way control, according to SRL.

Multiphase ADS is especially effective in areas of tidal traffic flow because of its ability to reduce the build-up of traffic moving in a single direction. It works by connecting a high-accuracy radar detector, which collects data about real-time traffic volumes and speeds, to portable and temporary traffic lights. It does so by using an algorithm that adjusts green time accordingly, taking into account the accommodation of HGV start lag.

“The demand for smart technologies capable of cutting congestion has never been greater,” said Adrian Murphy, chief operating officer for SRL Traffic Systems. “We are proud to be able to offer a multiphase solution with the proven capability of slashing queue lengths and waiting times, improving road users’ experience of roadworks.”

SRL says that Multiphase ADS is available for hire as well as sale. It joins a product portfolio that also includes variable message signs, CCTV and the Urban64 traffic signal solution used to coordinate multi-directional flows of traffic and pedestrians.

SRL estimates that there are over 20,000 portable and temporary traffic signals in use at more than 5,000 roadwork sites across the UK. If this be the case, then the company says its solution is capable of saving commuters more than seven minutes a day, over two hours every month and more than a day a year.

For more information on companies in this article

Related Content

  • Hanwha on the Pedemontana Veneta
    November 1, 2022
    The need for a motorway to link the cities of Vicenza and Treviso in northern Italy emerged in the 1970s as the Venetian countryside became increasingly urbanised. Meanwhile, the enlargement of the European Union to the east in the 1990s also brought more traffic across the region
  • Edeva makes Actibump available globally
    August 4, 2022
    Edeva, the Swedish manufacturer of Actibump, have, after 10 years and 100 installations in the Nordics and Australia, has made the system available worldwide.
  • State-of-the art road tunnels in construction and use of ITS
    April 25, 2013
    A wealth of major road tunnel construction projects and significant cant ITS installations within existing key road tunnels have been recently completed or will soon be underway. Guy Woodford examines some of them. A state-of-the art Tunnel Boring Machine (TBM) - the 10th largest ever to be built worldwide will be put to work later this year on New Zealand Transport Agency’s landmark Waterview Connection project in Auckland. The giant Herrenknecht-manufactured machine will be used to construct the twin 2.5
  • In control, with advanced technology
    August 15, 2019
    Machine control technology continues to advance, with new systems offering contractors major gains in working efficiency The latest developments in machine control technology once again push the bar in terms of advancements. The latest systems allow contractors to work even more effectively and efficiently than before. Doosan has unveiled one of the first uses globally of 5G technology to remotely control construction and quarrying machines. The firm has coined the term ‘TeleOperation’ to describe the