Skip to main content

A serious side to England’s funny funnel bins

The UK and Australia are trying to reduce litter on motorways and free up maintenance teams to pursue more urgent – and less dangerous - work Giant funnel bins are being installed at a dozen UK motorway service areas in north-west England. The bins, either 1.8m or 2.2m high, are next to Give Way lines at the exit of service area car parks. The bins allow both car and truck drivers to reach the half-metre-wide funnels from their vehicle window. Highways England is hoping that the bins’ ease of use will en
December 14, 2017 Read time: 2 mins
The UK and Australia are trying to reduce litter on motorways and free up maintenance teams to pursue more urgent – and less dangerous - work


Giant funnel bins are being installed at a dozen UK motorway service areas in north-west England. The bins, either 1.8m or 2.2m high, are next to Give Way lines at the exit of service area car parks. The bins allow both car and truck drivers to reach the half-metre-wide funnels from their vehicle window. 8100 Highways England is hoping that the bins’ ease of use will encourage drivers to deposit their refuse before leaving the rest area and not throw it out of the car window along the motorway.

The road agency estimates that more than 40,000 sacks of rubbish were collected off motorways in the region last year.

It costs taxpayers an estimated €45 for each sack of litter collected from motorways – roughly the same cost as fixing a pothole, according to Highways England. Collecting rubbish close to fast-moving traffic can also put workers at risk.

Meanwhile, in Australia, 6508 Main Roads WA will expand its six-month trial initiative to remove 270 roadside bins from Kimberley area highways to reduce litter. About 200 bins were removed and replaced with skip-bin disposal points at 24-hour rest-stops, according to Australian media reports.

Main Roads has said the initiative is “generally” supported by road users.

“The amount of loose litter in parking bays is much less than when litter bins were present and there has been no noticeable increase in the amount of roadside litter,”
it said.

For more information on companies in this article

Related Content

  • Serbia inks two road deals with China at 16plus1 summit
    April 23, 2019
    Serbia said it signed two road construction agreements with China during the 16plus1 Summit in Dubrovnik, Croatia earlier this month. The two deals are for construction of the Pozega-Boljare and Novi Beograd-Surcin road routes. The Pozega-Boljare project alone is worth €2 billion and will be financed from the existing loan from the Exim Bank, according to media reports. China’s east-west Belt and Road Initiative was the focus of the annual 16plus1 Summit that brought together leaders from Beijing plus
  • Diamond in the Pearl: China’s Hong Kong-Zhuhai-Macao Bridge complex
    March 8, 2018
    People in the Pearl River Delta are celebrating the Chinese New Year with the imminent opening of the Hong Kong-Zhuhai-Macao Bridge. David Arminas reviews progress. China’s Spring Festival, or Lunar New Year, is celebrated with the usual enthusiasm and spectacular fireworks. But celebrations will be particularly joyous for many people in the southern Pearl River Delta. The soon-to-be-open Hong Kong-Zhuhai-Macao Bridge (HZMB) will slash travel time between the Hong Kong Special Administrative Region, Zhuh
  • Busy UK interchange on M1 motorway close to completion
    August 28, 2018
    Work on a busy interchange on the UK motorway network is close to completion. The new off-slip has opened at junction 24 of the M1 motorway. The work to upgrade junction 24 and junction 24a is being carried out by contractor Winvic Construction. The new off-slip at junction 24 provides a direct connection from the A50 eastbound to the M1 southbound. The work forms part of SEGRO’s Nationally Significant Infrastructure Project (NSIP) - SEGRO Logistics Park East Midlands Gateway (EMG) - a ground-breaking
  • Brazil roads repaired with Wirtgen equipment
    November 6, 2018
    A large milling machine from Wirtgen has been used to help repair busy roads in the vicinity of São Paulo in Brazil. The roads provide important transport connections as they link São Paulo with Santos, Brazil’s largest port. The Anchieta-Imigrantes highway system provides the main link between the metropolitan region of São Paulo and the port of Santos, the busiest port in Latin America. Construction of the Anchieta highway began in 1947, with Imigrantes following at the start of the 1970s. Today the Anch