Skip to main content

Safer lighting

TMP’s new Spectralyte fibre composite signposts, lighting columns and LED illuminated posts, aimed at improving road safety, are compliant with European regulations having been crash and strength tested for every type and dimension of post and come with full CE certification.
February 28, 2012 Read time: 1 min
3273 TMP’s new Spectralyte fibre composite signposts, lighting columns and LED illuminated posts, aimed at improving road safety, are compliant with European regulations having been crash and strength tested for every type and dimension of post and come with full CE certification. They are manufactured by vacuum moulding glass fibre reinforced composite materials. Spectralyte has a third of the weight of steel and three times the tensile strength, and TMP’s Spectralyte range has an expected lifespan of over 50 years.

For more information on companies in this article

Related Content

  • Bridge and tunnel concrete testing vital for longevity
    July 9, 2012
    Modern technology is making testing more efficient and reliable, increasing productivity and reducing costs, as Patrick Smith reports A few years ago, visual inspection of an 18-year-old bridge by ARRB in Australia identified considerable cracking in the precast, prestressed deck planks as well as in the cast in situ deck overlay. Laboratory examination indicated that the deck planks and the deck overlay were suffering from a strong case of alkali-aggregate reaction (AAR). Testing of concrete cores drilled
  • Clearer road markings influence driver behaviour
    July 12, 2012
    Research into driver behaviour has identified that driver safety and decision-making can be positively influenced by clearer and higher performing road markings. Patrick Smith reports. Bare roads will lead to total vehicular confusion. Markings are painted on the road to direct, guide and regulate the road user, and include all lines patterns, words and colours applied on or attached to the road surface or kerb for these purposes.
  • Drilling rig meets the utility supply challenge
    April 11, 2012
    A tricky utility supply project has been carried out in difficult conditions in Germany, without disturbing a village access road. The drilling work for the project was operated by boring contractor Beermann and the site was located on a plateau some 5km from the nearest village.
  • Drilling rig meets the utility supply challenge
    May 9, 2012
    A tricky utility supply project has been carried out in difficult conditions in Germany, without disturbing a village access road. The drilling work for the project was operated by boring contractor Beermann and the site was located on a plateau some 5km from the nearest village.