Skip to main content

Safer with 3i Innovation’s lighting for Mount Victoria Tunnel

In New Zealand, 3i Innovation's on-road markers and Tunnel Guidance markers are providing emergency evacuation lighting for the refurbished iconic Mount Victoria tunnel in the capital city Wellington.
January 6, 2017 Read time: 2 mins
3i in Wellington’s Victoria Tunnel

In New Zealand, 151 3i Innovation's on-road markers and Tunnel Guidance markers are providing emergency evacuation lighting for the refurbished iconic Mount Victoria tunnel in the capital city Wellington.

The 85-year-old State Highway 1 tunnel is a part of the route from Wellington Airport to the rest of the country’s North Island. It also connects the eastern suburbs to the central city and beyond. The extensive upgrade started in April 2015 and was completed in June.

Upgrade includes energy efficient LED 'intelligent' systems. Lights dim and brighten at the portals in response to outdoor light.

Conditions for driving through the tunnel have been improved with 1,000 light-reflecting white panels beside the carriageway, a new paint palette and inductively powered LED road markers along the sides and centreline. The panels are fire-resistant, adding to the tunnel’s safety profile.

The LED road delineators - are electronically programmed to pulse and strobe in sequence toward the exits in an emergency, guiding people safely out. The system is a world-first use of delineators to this extent, according to the agency.

3i’s work on the project included the supply and commissioning of 124 Tunnel Guidance Markers, 64 Tunnel Lane Markers and associated power supplies - 2x IPL1200i and 1x IPH2000i – along with customised firmware for the emergency modes.

The Tunnel Lane Markers in the centre line provide greater safety through stronger delineation and alignment - critical for the management of bi-directional tunnels, says 3i.

During normal conditions the markers are on standby at a dimmed light output. In the event of an emergency the markers will turn on and cascade towards the safest exit to guide pedestrians out of the tunnel.

Emergency mode activation causes the LED road and edge markers to cascade towards the nearest safe exit.

The tunnel has also been repainted inside and out with a colour scheme that features light blue inside the portals and along the walkway, soft white on the lower walls and new carriageway wall panels, as well as black on the ceiling.

For more information on companies in this article

Related Content

  • Simex machine helps deliver new tunnel lining
    December 3, 2014
    In Italy an MP1000 cutting system from Simex has been used to help resurface the walls of a highway tunnel. The SS51 State Road crosses through the Dolomites in the north-eastern Alpine Region of Italy. The SS51 starts in San Vendemiano in the province of Treviso and ends in Dobbiaco in the province of Bolzano and is a key road because it connects Cadore and the main towns in the area of Cortina d'Ampezzo. This 134.4 km road has expansion work and upgrades to improve safety and boost capacity.
  • Key UK tunnel opens
    February 27, 2012
    The UK's new Hindhead Tunnel is now open to traffic. The ?420 million (£371 million) tunnel runs under the Devil's Punch Bowl in Surrey and will reduce congestion, while boosting safety on the busy A3 route.
  • Safety issues fuel interest at PIARC’s tunnel conference in Lyon
    June 4, 2019
    Alternative fuel and automated vehicle issues occupied minds at PIARC’s first international road tunnel safety conference. David Arminas reports from Lyon More than ever, tunnel management must done in a wholistic fashion, said Andre Broto, president of PIARC, the World Road Association, based in Paris. With those sentiments, Broto kicked off PIARC’s first International Conference on Tunnel Operations and Safety. One of the first speakers, Sandrine Bernabei Chinzi, head of transport infrastructure at Fr
  • Stockholm’s new bypass
    March 8, 2021
    Tunnels make up 18km of the 21km of the Swedish capital’s E4 Bypass mega-project. It will have taken 15 years from start to opening in 2030, if all goes well