Skip to main content

Safer with 3i Innovation’s lighting for Mount Victoria Tunnel

In New Zealand, 3i Innovation's on-road markers and Tunnel Guidance markers are providing emergency evacuation lighting for the refurbished iconic Mount Victoria tunnel in the capital city Wellington.
January 6, 2017 Read time: 2 mins
3i in Wellington’s Victoria Tunnel

In New Zealand, 151 3i Innovation's on-road markers and Tunnel Guidance markers are providing emergency evacuation lighting for the refurbished iconic Mount Victoria tunnel in the capital city Wellington.

The 85-year-old State Highway 1 tunnel is a part of the route from Wellington Airport to the rest of the country’s North Island. It also connects the eastern suburbs to the central city and beyond. The extensive upgrade started in April 2015 and was completed in June.

Upgrade includes energy efficient LED 'intelligent' systems. Lights dim and brighten at the portals in response to outdoor light.

Conditions for driving through the tunnel have been improved with 1,000 light-reflecting white panels beside the carriageway, a new paint palette and inductively powered LED road markers along the sides and centreline. The panels are fire-resistant, adding to the tunnel’s safety profile.

The LED road delineators - are electronically programmed to pulse and strobe in sequence toward the exits in an emergency, guiding people safely out. The system is a world-first use of delineators to this extent, according to the agency.

3i’s work on the project included the supply and commissioning of 124 Tunnel Guidance Markers, 64 Tunnel Lane Markers and associated power supplies - 2x IPL1200i and 1x IPH2000i – along with customised firmware for the emergency modes.

The Tunnel Lane Markers in the centre line provide greater safety through stronger delineation and alignment - critical for the management of bi-directional tunnels, says 3i.

During normal conditions the markers are on standby at a dimmed light output. In the event of an emergency the markers will turn on and cascade towards the safest exit to guide pedestrians out of the tunnel.

Emergency mode activation causes the LED road and edge markers to cascade towards the nearest safe exit.

The tunnel has also been repainted inside and out with a colour scheme that features light blue inside the portals and along the walkway, soft white on the lower walls and new carriageway wall panels, as well as black on the ceiling.

For more information on companies in this article

Related Content

  • Lanes removes 400tonnes of debris from flood-scheme tunnel in UK
    March 28, 2017
    It was “dirty work” for drainage engineers from Lanes Group in the UK when they recently removed 400tonnes of silt and debris from a culvert in northern England. Before sludge removal started, the 3m-wide concrete box culvert under the A38 on the outskirts of the city of Derby had been full almost to its roof. Lanes Group's East Midlands depot, based in Derby, desilted the culvert in a 17-day operation for North Midland Construction, working for Highways England, under its civil engineering framework.
  • Eradicating work zone danger
    June 26, 2013
    New safety systems for highway work zones are helping to reduce deaths and injuries in the United States, while much work is being done in Europe to improve work zone safety. Guy Woodford reports. With more road building underway than at any one time in Texas history, the US Lone Star state’s Department of Transportation (TxDOT) is introducing its first highway safety system with queue-warning technology and temporary rumble strips to cut work zone collisions. Debuting along a central Texas stretch of the
  • Upgrade required for key Canadian tunnel link
    June 4, 2019
    A major upgrade project is to be carried out for Montreal’s Louis-Hippolyte-La Fontaine Tunnel in Canada. The work is expected to cost US$386 million (C$500 million) and will commence in 2020. New fire protection technology will be installed, along with more modern signage and lighting. Better emergency provision will also be installed, to meet the latest safety requirements. A dedicated lane will be for car-pooling or buses only, in a bid to reduce peak time congestion while the improvements are being carr
  • Stantec: coming to an infrastructure site near you
    April 13, 2017
    Acquisitive Canadian firm Stantec is snapping up more transportation expertise as it moves out of its home North American market. David Arminas reports. Last December, politicians from the US states of Kentucky and Indiana celebrated the opening of the second of two major bridges. A ribbon-cutting ceremony took place in cold wintry weather on the new 762m-long cable-stayed Lewis and Clark Bridge. The event marked the finish of the prestigious three-and-half-year Ohio River Bridges Project.