Skip to main content

Safer with 3i Innovation’s lighting for Mount Victoria Tunnel

In New Zealand, 3i Innovation's on-road markers and Tunnel Guidance markers are providing emergency evacuation lighting for the refurbished iconic Mount Victoria tunnel in the capital city Wellington.
January 6, 2017 Read time: 2 mins
3i in Wellington’s Victoria Tunnel

In New Zealand, 151 3i Innovation's on-road markers and Tunnel Guidance markers are providing emergency evacuation lighting for the refurbished iconic Mount Victoria tunnel in the capital city Wellington.

The 85-year-old State Highway 1 tunnel is a part of the route from Wellington Airport to the rest of the country’s North Island. It also connects the eastern suburbs to the central city and beyond. The extensive upgrade started in April 2015 and was completed in June.

Upgrade includes energy efficient LED 'intelligent' systems. Lights dim and brighten at the portals in response to outdoor light.

Conditions for driving through the tunnel have been improved with 1,000 light-reflecting white panels beside the carriageway, a new paint palette and inductively powered LED road markers along the sides and centreline. The panels are fire-resistant, adding to the tunnel’s safety profile.

The LED road delineators - are electronically programmed to pulse and strobe in sequence toward the exits in an emergency, guiding people safely out. The system is a world-first use of delineators to this extent, according to the agency.

3i’s work on the project included the supply and commissioning of 124 Tunnel Guidance Markers, 64 Tunnel Lane Markers and associated power supplies - 2x IPL1200i and 1x IPH2000i – along with customised firmware for the emergency modes.

The Tunnel Lane Markers in the centre line provide greater safety through stronger delineation and alignment - critical for the management of bi-directional tunnels, says 3i.

During normal conditions the markers are on standby at a dimmed light output. In the event of an emergency the markers will turn on and cascade towards the safest exit to guide pedestrians out of the tunnel.

Emergency mode activation causes the LED road and edge markers to cascade towards the nearest safe exit.

The tunnel has also been repainted inside and out with a colour scheme that features light blue inside the portals and along the walkway, soft white on the lower walls and new carriageway wall panels, as well as black on the ceiling.

For more information on companies in this article

Related Content

  • Expanded and branded
    October 4, 2022
    Connected-up cycling is becoming more important in France as the way to keep cyclists from giving up their COVID habit of pedalling to work and for pleasure. David Arminas reports
  • Kuwait’s Sheikh Jaber al-Ahmad Al-Sabah Causeway opens
    August 27, 2019
    World Highways revisits the world’s fourth longest sea bridge - four years to construct and which has slashed travel time between Kuwait’s largest island and the capital city
  • Agua Negra tunnel between Chile and Argentina
    May 15, 2014
    The current Paso de Agua Negra is the highest border crossing between Chile and Argentina. On the Argentine side, the Agua Negra Pass is located at 4,765m above sea level and 260km from the city of San Juan in the province of San Juan in the north-west of the country. On the Chilean side, the pass lies 229km from the city of La Serena in the Coquimbo region. The pass can be accessed from the Argentine side via National Highway No 150 from the province of La Rioja, which runs for a total of 390km. From the C
  • Develon launches new tunnelling excavator
    February 20, 2025

    Develon has launched the DX235RTF-7 tunnelling excavator, an extension to the company’s line-up of special application machines.

    The DX235RTF-7 is based on Develon’s well-established DX235LCR-7 reduced radius crawler excavator and is powered by a DL06V Stage V engine, providing 141kW of power. The DX235RTF-7 uses the successful compact design and minimum swing radius of the DX235LCR-7. However, the key part of the machine is the heavy duty tunnelling front, offering a new arm and boom design with special kinematics and a tilting function.