Skip to main content

Safer with 3i Innovation’s lighting for Mount Victoria Tunnel

In New Zealand, 3i Innovation's on-road markers and Tunnel Guidance markers are providing emergency evacuation lighting for the refurbished iconic Mount Victoria tunnel in the capital city Wellington.
January 6, 2017 Read time: 2 mins
3i in Wellington’s Victoria Tunnel

In New Zealand, 151 3i Innovation's on-road markers and Tunnel Guidance markers are providing emergency evacuation lighting for the refurbished iconic Mount Victoria tunnel in the capital city Wellington.

The 85-year-old State Highway 1 tunnel is a part of the route from Wellington Airport to the rest of the country’s North Island. It also connects the eastern suburbs to the central city and beyond. The extensive upgrade started in April 2015 and was completed in June.

Upgrade includes energy efficient LED 'intelligent' systems. Lights dim and brighten at the portals in response to outdoor light.

Conditions for driving through the tunnel have been improved with 1,000 light-reflecting white panels beside the carriageway, a new paint palette and inductively powered LED road markers along the sides and centreline. The panels are fire-resistant, adding to the tunnel’s safety profile.

The LED road delineators - are electronically programmed to pulse and strobe in sequence toward the exits in an emergency, guiding people safely out. The system is a world-first use of delineators to this extent, according to the agency.

3i’s work on the project included the supply and commissioning of 124 Tunnel Guidance Markers, 64 Tunnel Lane Markers and associated power supplies - 2x IPL1200i and 1x IPH2000i – along with customised firmware for the emergency modes.

The Tunnel Lane Markers in the centre line provide greater safety through stronger delineation and alignment - critical for the management of bi-directional tunnels, says 3i.

During normal conditions the markers are on standby at a dimmed light output. In the event of an emergency the markers will turn on and cascade towards the safest exit to guide pedestrians out of the tunnel.

Emergency mode activation causes the LED road and edge markers to cascade towards the nearest safe exit.

The tunnel has also been repainted inside and out with a colour scheme that features light blue inside the portals and along the walkway, soft white on the lower walls and new carriageway wall panels, as well as black on the ceiling.

For more information on companies in this article

Related Content

  • Road markings important for road safety
    February 20, 2012
    Manufacturers are constantly upgrading marking materials and equipment. Now those responsible for highways are being asked to do more as Patrick Smith reports. A recent report claimed that nearly one-third of the length of Britain's single carriageway A-roads have white lines so worn out that they do not meet recognised standards. According to the LifeLines Report, an assessment of more than 2,400km of the road network, Britain's most dangerous roads have the most worn-out centre line markings of all, leavi
  • Underground expansion pushes tunnelling market
    June 13, 2012
    Infrastructure investment means that the road tunnel construction sector is healthy due to demand for new links – Mike Woof reports With many emergent nations investing heavily in infrastructure, the tunnelling sector is seeing extensive business at present. Tunnels provide key links in mountainous areas or in congested cities where building roads on the surface may not be practical. In Asia and Latin America, many key road connections are now being built underground to pass challenging terrain or provide
  • New bridges, ramp and tunnel for Dubai
    February 19, 2020
    New flyover bridges, a ramp and a tunnel connection are being built in Dubai.
  • Temporary ProLight solar lighting illuminates the UK’s A14 upgrade
    January 9, 2019
    The A14 Cambridge to Huntingdon improvement scheme has become the first UK project to use temporary solar - instead of diesel - lighting. The A14 is the UK’s biggest road construction project with a budget of nearly US$2 billion to upgrade 34km of trunk road between Cambridge and Huntingdon with completion set for December 2020. The A14 Integrated Delivery Team, working on behalf of project client Highways England, is the largest user in the country of year-round temporary solar trailer-transported lights.