Skip to main content

The Rollsroller Traffic 600/145T is a sign of the times

The Rollsroller Traffic flatbed mounting and lamination applicator, from Swedish sign maker Rollsroller, is designed specifically for high-volume production of road signs It has a special profile bed adjustable to fit almost any extruded guide sign panels, according to the manufacturer. Bed length for the Rollsroller Traffic 600/145T model is 6,000mm and width is 1,450mm. The pneumatically controlled roller is automatically adjusted for substrates up to 60mm. The adjustable aluminium profile bed is desig
April 4, 2018 Read time: 2 mins
Rollsroller is a patented technology for flatbed mounting and lamination
The 8725 Rollsroller Traffic flatbed mounting and lamination applicator, from Swedish sign maker Rollsroller, is designed specifically for high-volume production of road signs


It has a special profile bed adjustable to fit almost any extruded guide sign panels, according to the manufacturer. Bed length for the Rollsroller Traffic 600/145T model is 6,000mm and width is 1,450mm. The pneumatically controlled roller is automatically adjusted for substrates up to 60mm. The adjustable aluminium profile bed is designed specifically for mounting a high volume of guide sign panels.

There is also a roll holder on a glide beam for pre-masking tape and laminate. A stop static kit (cord and magnet) will dissipate static electricity. The Traffic model is most often used in combination with one of Rollsroller’s other units - an entry, regular or premium model - to create a complete workflow. The latest entry model is the Rollsroller 340/170E which has a bed length of 3,400mm and width of 1,700mm.

The applicators are manufactured from start to finish at the company’s factory in Karlstad, Sweden, to ensure quality control, according to Rollsroller. The chassis and beam are made completely out of steel because it does not deform over time, even if the underlying surface is uneven.

In March, Rollsroller will demonstrate its applicators at 244 Intertraffic Amsterdam and at ISA Sign Expo in Orlando in the US state of Florida. Then at the Sign and Digital show in Birmingham, UK, in April and at FESPA Berlin, Germany, in May.

For more information on companies in this article

Related Content

  • Developments in compact asphalt compaction
    February 20, 2012
    An array of new models has increased competition in the market for compact asphalt compaction products - Mike Woof reports
  • Simex RS 16 planer for creating rumble strips
    March 22, 2017
    Simex says that its new RS 16 planer for creating rumble strips is an efficient alternative to costly specially designed machines or small manual equipment Rumble strips created by intermittent milling of the wearing course offer the advantage of lower production costs and a higher durability than those made using elastoplastic adhesives - laminates. Compared to adhesives, rumble strips created by surface milling also have the important advantage of being indented and not raised, a characteristic that av
  • Mobile crushing and screening machine advances
    July 23, 2018
    A series of major new advances are being seen in the crushing and screening equipment market – Mike Woof writes New developments are coming for the aggregate production sector, with a host of new technologies for the crushing and screening segment. These new machines are said to be more versatile, more productive, more efficient and offer a lower cost/tonne than any equipment available previously. CDE claims that its new AggMax 163-SR scrubbing and attrition system features an efficient new RotoMax logw
  • Challenging bridge demolition
    March 2, 2012
    DEMOLITION and blasting experts Philipp Halter of Berlin, Germany, faced a challenging job: in just 48 hours it had to demolish the southern section of the Spandau Dam Bridge crossing the A 100. The efficient interaction of Atlas Copco hydraulic breakers and hydraulic CombiCutters, mounted on seven Volvo excavators, is said to have played a crucial role after following a carefully planned schedule. During Friday night a bed of sand was placed under the bridge to allow the girders and reinforcements torn dow