RMD launches R800 panel girder

RMD Kwikform has launched its heavy-duty R800 modular panel girder system which the company says is the only CE-marked girder system on the market.
July 19, 2022 Read time: 3 mins
The R800 allows construction of clear spanning and bridging structures by enabling long lattice girders to be assembled quickly and safely (image courtesy RMD Kwikform)

“While not all projects will need a CE marked solution, meeting this standard demonstrates a commitment to the highest levels of quality assurance, so contractors can be confident they’re selecting a system that goes above and beyond the minimum requirements,” said Ian Fryer, divisional product innovation director at RMD.

The R800 allows construction of clear spanning and bridging structures by enabling long lattice girders to be assembled quickly and safely. It is ideally suited to meet the most demanding requirements for simply supported, continuous/multi-span, cantilever or launched falsework and vehicle, pedestrian and service bridging.

Galvanised components produced in accordance with the European Union’s EN 1090 (Execution Class 3) guarantee a safe, reliable system and reduced cost of ownership over a long product life. Users will benefit from higher strength steels and optimised forged girder connections engineered to be equal in strength to the parts they connect - resulting in the highest available strength-to-weight ratio and enhanced fatigue performance. In contrast, many alternative systems have their performance compromised because of reduced strength at the pin joints.

RMD says that versatility is a key feature of R800. Its trapezoidal end panel enables support from the top chord. This reduces the required headroom and minimises clashes with battered abutments, while at the same time maximising opportunities for structural support using permanent works foundations. The trapezoidal panel can also be used inverted, affording the same geometry advantages for the support of spans supported by V-shaped piers and arches.  

Further flexibility is provided by the inclusion of 4.5m-, 2.25m- and 1.25m-long quarter length girder panels, together with tapered end posts. When coupled with slidable bearings, these provide continuous and infinitely adjustable span length adjustment for a better fit with permanent works piers and foundations, as well as facilitating the support of skewed spans with standard equipment.

Even more advantages result from the R800’s compatibility with the RMDK 80kN Rapidshor falsework system, with screw jacks mating directly with the top chord of the R800 girder at the girder node points. Structurally this loads the R800 girders optimally, meaning fewer girders are required per scheme. It also enables pre-camber, longitudinal falls and super-elevation to be handled without the need for full-on falsework above the girders, further reducing required headroom.

Inclusion of the high shear girder at the ends of the falsework span can further reduce the numbers of girders required on site. The new panel girder system can also be used in conjunction with RMDK’s leading Megashor and Superslim products, making it even more versatile.

The result of this is a heavy-duty solution that saves contractors time and money, while improving their sustainability credentials too. The versatility of the R800 range, combined with its strength-to-weight ratio minimises the amount of equipment required and therefore time to erect, which in turn reduces labour, plant and transport costs, lowering overall carbon footprint.

For more information on companies in this article

Related Content

  • Doka rises to the challenge on Turkey’s Eyiste Viaduct
    June 4, 2019
    Formwork specialist Doka recently rose to the challenge on Turkey’s Eyiste Viadust, the country’s highest bridge with piers up to 155m tall. The Eyiste Viaduct will be part of a route between Central Anatolia and Turkey’s Mediterranean region, shortening travel time between the cities of Konya and Alanya. Cantilever forming travellers and Doka’s automatic climbing formwork Xclimb 60 were part of the construction solution. The viaduct is nearly 1.4km long and carried by two abutments and eight piers, stret
  • Bridge engineering worldwide
    July 1, 2013
    Guy Woodford looks at vital bridge construction, repair and inspection projects in China, Europe, North America and Australia The Heron Road Bridge in Ottawa, Ontario in Canada is a vital link within the City’s transport network, as it crosses the Rideau River, which divides the east and west parts of the City. Constructed in 1966-1967, the Heron Road Bridge is approximately 275m long and includes six lanes.
  • RMD divisional operations director Ian Hayes on global formwork market
    May 21, 2014
    Ian Hayes, RMD Kwikform’s divisional operations director, gives an overview of the current global formwork and shoring market Over the recent past, the formwork and shoring market has been changing as the global economic recovery begins to take shape and different countries again begin to invest in key infrastructure projects. Notably there has been a shift in the Middle East, as countries like Saudi Arabia, Kuwait and Oman embark on major airport and the road infrastructure projects to support developme
  • Hanging out with Pilosio's Flydeck
    November 9, 2022
    The result is a perfectly horizontal plane for bridge workers in any situation where a suspended solution is needed.