Skip to main content

Parsons to design traffic management system for Florida’s I-95

Florida’s Department of Transportation has selected Parsons to provide final design services for an expansion of a traffic management system on the I-95.
September 29, 2016 Read time: 1 min

Florida’s Department of Transportation has selected 3220 Parsons to provide final design services for an expansion of a traffic management system on the I-95.

The 27km project, from north of Jacksonville International Airport to the Georgia state line, will involve intelligent transportation systems and solutions. Included are archived data management, automatic vehicle identification, closed-circuit television cameras, dynamic message signs, microwave vehicle detection and road weather information.

Parsons will be responsible for designing the communications backbone for the traffic management system, as well as identifying and designing the individual devices required to fully cover the corridor.

For more information on companies in this article

Related Content

  • Yunex Traffic management for Hamburg
    April 28, 2022
    More than 150,000 vehicles pass along the A7 in Hamburg, Germany, every day – increasing regularly. To ensure continued safety on the route, highway operator Die Autobahn launched an extensive renovation project on the A7. Traffic technology on the city highway will be optimised, digitised and connected in 18 construction phases.
  • NCDoT selects Activu for new, world-class, multi-agency joint forces headquarters
    March 19, 2012
    Activu Corporation, a leading provider of IP-based visualisation and collaboration solutions for mission-critical command and control centre environments, has designed, built, installed and commissioned a turnkey large-scale visualisation system at the statewide transportation operations centre (STOC) in the State of North Carolina’s Joint Forces Headquarters (JFHQ) building in Raleigh, North Carolina.
  • FGinal stage of Florida project
    July 28, 2016
    Work is now commencing on the final stretch of the Wekiva Parkway, State Road 429, in Florida. This will be the fifth section of the parkway, with the work being managed by the Central Florida Expressway Authority (CFX). Section 2A will stretch 3.2km and the construction work expected to be complete in January 2018. This US$38.65 million project will be located north of Haas Road between Plymouth Sorrento Road and County Road 435 (Mount Plymouth Road). Section 2A will connect to Section 2B, the systems int
  • AtkinsRéalis for Georgia transport resilience
    June 25, 2024
    AtkinsRéalis will develop strategies that integrate vulnerability assessment results into asset management systems with the goal of protecting the US state’s transportation network.