Skip to main content

Oklahoma opts for IRD’s electronic truck screening system

In a US$2.59 million contract, Dynamics (IRD) is to build, implement and maintain a port-of-entry (POE) electronic screening system for commercial vehicles in the US state of Oklahoma.
September 30, 2016 Read time: 2 mins

In a US$2.59 million contract, Dynamics (248 IRD) is to build, implement and maintain a port-of-entry (POE) electronic screening system for commercial vehicles in the US state of Oklahoma.

The Oklahoma Department of Transportation (ODOT) awarded IRD the contract for work at Interstate-35 northbound in Love County. This is the fourth such system to be supplied by IRD, as ODOT continues with deployment of additional systems throughout the state.

The system allows trucks with compliant weight, dimensions and credentials to bypass the port-of-entry inspection station at highway speeds. This reduces the number of trucks that stop, meaning port officials can focus on potentially high-risk or non-compliant commercial vehicles.

IRD is supplying its weigh-in-motion (WIM) and intelligent Roadside Operation Credentialing (iROC) system. The iROC uses licence plate reader (LPR) and USDOT reader technology, vehicle dimensioning, integrated static scale, video verification, vehicle movement compliance and operational and reporting software.

This site will be added to the IRD-supplied host operations and maintenance operations management system. This will provide ODOT with a complete picture of activity across this and other POE locations state-wide.

The systems provide a central repository for data with a web-based data access tool to provide real-time information, historical reporting and business intelligence through one system portal. The maintenance operations management system also provides ongoing site health monitoring and equipment status information.

IRD, based in the Canadian province of Saskatchewan, also recently provided the province of British Columbia with variable speed limit signs along three highways - 99, 5 and 1. Their high elevations in the Rocky Mountains make them especially prone to rapid weather changes.

Static message signs at the entrance to each corridor inform travellers they are entering a variable speed zone. A digital message sign (DMS) at the beginning of each corridor warns drivers of changing weather conditions. Flashing lights above each variable speed limit sign are activated when a reduced speed limit is in effect.

Traffic, road and visibility sensors monitor real-time traffic speeds as well as road and weather conditions to provide recommended reduced speeds back to operations staff who then adjust the electronic signs to let drivers know what speed they should be travelling for the current conditions. Webcams installed along each of the routes monitor traffic and weather conditions to provide drivers and highway operators with real-time information on road conditions.

For more information on companies in this article

Related Content

  • Efficient road traffic management for large-scale sporting events
    October 25, 2022
    Modern road networks require a significant amount of infrastructure to function, from the roads themselves to signage, as well as other assets that are needed to keep things running. Throw in the digitisation of road networks and infrastructure requirements will significantly increase, especially when it comes to the introduction of connected (“internet-of-things”) devices and an array of sensor systems required for road monitoring.
  • New international trade crossing linking Canada and US
    June 9, 2015
    The Detroit River is short, only 45km, and narrow in places, less than 1km. Around a quarter of the annual $658 billion Canada-US trade crosses over the river. That’s $160 billion worth of goods trucked each year between Detroit in the US state of Michigan and the Canadian city of Windsor in the province of Ontario - the Windsor-Detroit Corridor. There are several types of crossings, but the vast majority of commercial traffic must use the 2.3km Ambassador Bridge (see box). A new bridge was initially prop
  • Flatiron wins Steveston work in Canada
    April 18, 2022
    The Steveston Interchange project near Vancouver is key for improving traffic flow into what will be a new immersed Massey Tunnel under the Fraser River.
  • Oklahoma highway surface upgrade
    February 2, 2017
    A milling and paving project has provided a necessary surface upgrade for a busy stretch of highway in Oklahoma US Route 62 is an important route and runs 3,597km from the Mexico-US border at El Paso, Texas, to Niagara Falls, New York, on the Canada–US border. A 12km section of the road where it runs through in Oklahoma recently received a rehab. The Oklahoma Department of Transportation (ODOT) project started in Blanchard, Oklahoma, and headed west. This stretch was built in 2000 when ODOT was switc