Skip to main content

No turning around for Gateshead with Signstr8 anti-rotational posts

The northern English city of Gateshead has adopted Signstr8 anti-rotational sign posts from SignPost Solutions to help reduce maintenance costs. Gateshead has specified Signstr8 for all of its steel post sign installations where strength capacity allows. As opposed to standard round poles, the 76mm diameter steel Signstr8 pole has a 30mm flat face to prevent the sign from being misaligned or rotated. The design avoids the need for costly call-outs to ensure signs are correctly orientated. They can prevent
April 4, 2018 Read time: 2 mins
Signstr8 anti-rotational sign posts are keeping travellers in Gateshead on the right track
The northern English city of Gateshead has adopted Signstr8 anti-rotational sign posts from 2439 SignPost Solutions to help reduce maintenance costs.


Gateshead has specified Signstr8 for all of its steel post sign installations where strength capacity allows. As opposed to standard round poles, the 76mm diameter steel Signstr8 pole has a 30mm flat face to prevent the sign from being misaligned or rotated.

The design avoids the need for costly call-outs to ensure signs are correctly orientated. They can prevent unnecessary and costly disputes as the signs are always facing the right way.

Trevor Waggett, engineering manager at Gateshead Council, said that his team had previously purchased tubular and square poles for different applications. “With Signstr8, however, multiple applications can be accommodated which simplifies and streamlines the procurement process, reduces order times and prevents stocking issues.”

The patented Signstr8 anti-rotational sign post accepts standard clips, base plates and external caps. It complies with passive safety standards because the moment capacity is significantly lower than that of a standard 89mm x 3.2mm S355 grade steel post, according to the manufacturer.

Designed to BS EN 12899 and precision rolled to EN 10305-3, the posts are available as galvanised (to ISO 1461), PVC coated (grey or black), painted and more recently in aluminium 76mm and 89mm diameters.

For more information on companies in this article

Related Content

  • New chapter for bituminous slurry in Colombia
    January 11, 2019
    Colombia’s San Rafael road concessionaire is using its first VSB Macropaver 12B unit to maintain a road carrying heavy traffic volumes – Enrique Saez writes The use of bituminous slurry for road maintenance works in Colombia is taking a new step forward with the purchase of equipment from VSS Macropaver by road contractors in the country. Engineer Ezequiel Romero, manager of the concessionaire San Rafael, explained that the application of bituminous grout has delivered major benefits for the firm. The c
  • Doka eyes Grand Paris project
    April 25, 2018
    A huge tunnel formwork takes centre stage on Doka’s stand at Intermat, as the French arm of the business looks to Europe’s biggest infrastructure project, the €38.5 billion Grand Paris Express metro. “In the last few years, Doka has become well-known in the residential sector in France. Now we want to show that we are experts in infrastructure as well,” says Doka France’s head of product management and marketing, Oscar Castilla. The tunnel formwork, SL1, used to form the crown of a tunnel, has recently b
  • Grimsby’s Corporation Bridge work extended
    March 6, 2024
    Refurbishment of the nearly 100-year-old bascule bridge in northern England is being done by Spencer Group with project management by Equans.
  • Intelligent paving tool from BOMAG
    April 9, 2025

    The innovative BOMAP Pave solution offers connected construction capabilities for paving works. BOMAG’s new system allows networking of pavers and rollers, boosting efficiency and quality in asphalt paving jobs.

    Pavers and asphalt rollers can be connected within an open, manufacturer-independent system. This allows control of the paving process from asphalt delivery to compaction. It provides users with full transparency in real time, reducing coordination effort and sustainably improving site processes.