Skip to main content

Murphy Plant goes green with Trime X-Eco LED light towers

Murphy Plant, a rental company in England, has expanded its fleet with the purchase of 45 X-ECO LED lighting towers from Trime UK. The units delivered to Murphy Plant are dressed in the company’s “Murphy green” livery and are ready to be sent to sites throughout the country. Murphy Plant offer everything from small electrical drills to a 135tonne crawler crane, or even specialist equipment within rail, pipelines, tunnelling, marine or ground engineering. Trime has calculated that the X-ECO LED uses nearl
January 9, 2019 Read time: 2 mins

Murphy Plant, a rental company in England, has expanded its fleet with the purchase of 45 X-ECO LED lighting towers from Trime UK.

The units delivered to Murphy Plant are dressed in the company’s “Murphy green” livery and are ready to be sent to sites throughout the country.

Murphy Plant offer everything from small electrical drills to a 135tonne crawler crane, or even specialist equipment within rail, pipelines, tunnelling, marine or ground engineering.

Trime has calculated that the X-ECO LED uses nearly €380 less in fuel each month compared to many traditionally illuminated lighting sets. Also, its sturdy, robust design withstands the rigours of the rental market, said Mike Carpenter, director of Murphy Plant. Meanwhile, critical power supply specialists WB Power Services, based in northern England, has bought 20 of the Trime X-ECO LED towers. The purchase is part of the company’s first venture into the temporary site lighting hire market, said John Campbell, WBPS Hire sales manager.

Related Content

  • Italian market up in Q1 for 2019
    May 2, 2019
    17% to reach 3,178 units in the first quarter of 2019 compared to Q1 last year. In more detail, 3,058 of the units sold were earth-moving machines with the rest being 120 road equipment. “The growth of the Italian market in the first quarter it a very positive signal,” said Antonio Strati, councillor of Unacea, the Italian Construction Equipment Association which also has responsibility for statistics activities. “Although concerns remain over the general economic trend, we expect that the awaited
  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s
  • Doosan’s DA30-5 ADT make the grade in the UK and Norway
    March 29, 2017
    Doosan’s DA30-5 Stage IV/Tier 4 Final compliant articulated dump trucks are proving popular in the UK and Norway. Contractor Lyndon Thomas, based in Northampton in the UK, recently took delivery of eight new Doosan DA30-5 ADTs, the biggest single order for Doosan trucks in the UK.
  • Earthmoving machines the backbone of construction
    February 7, 2012
    Earthmoving machines remain the backbone of construction operations - writes Mike Woof. ADTs, excavators and wheeled loaders play pivotal roles in most construction jobs with the earthmoving stage providing a key component of most projects.