Skip to main content

McCann lights up the M1 in major upgrade

UK engineering firm J. McCann is installing 500 lighting columns and accessories as part of a major 12km upgrade to one of England’s busiest motorways.
January 7, 2019 Read time: 1 min

UK engineering firm J. McCann is installing 500 lighting columns and accessories as part of a major 12km upgrade to one of England’s busiest motorways. The year-long project on the M1 between junctions 23a – 25 is expected to finish sometime this autumn. Work includes 100,000m of lighting cable, 12,000m of lighting duct infrastructure, 40,000m of communication cable and 230 communication cabinets. McCann is also installing technology to 27 new gantries as well as 13 existing gantries in the Smart Motorway upgrade.


The project includes conversion of the hard shoulder to create a fourth lane between junctions 24 and 25 as well as alterations to junctions 24 and 25 to accommodate the new fourth lane. It also includes the implementation of variable speed limits and associated smart motorway systems, new CCTV systems and electronic signage, a hardened central reservation and a queue detection system to control congestion. As a subcontractor, McCann has been working alongside 2319 Costain and Galliford Try for client 8100 Highways England. The company has also worked on smart motorway schemes for main contractor Costain - namely improvements between M1 junctions 32 to 35a and M1 junctions 19 to 16.

For more information on companies in this article

Related Content

  • UK’s M3 motorway gets first orange emergency area
    August 1, 2017
    The first of a new-style smart motorway emergency stop area is being trialled on the M3 in England. The redesigned emergency area has a highly visible orange road surface and better signs to improve its visibility, according to Highways England, the wholly government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.
  • UK’s controversial Stonehenge Bypass tunnel to go ahead
    February 21, 2024
    The UK’s controversial Stonehenge Bypass tunnel project is to go ahead.
  • East Africa’s dream of a ‘Silk Road’ in sight
    October 22, 2021
    East Africa’s dream of a ‘Silk Road’ route to boost trade and transport is now in sight