Skip to main content

Mallatite and TRT Lighting brightens up Scotland’s Erskine Bridge

Mallatite has supplied aluminium lighting columns and LED road lanterns as part of the Erskine Bridge Lighting and Electrical Refurbishment Project for Transport Scotland. The project is set to enhance night-time driving visibility and reduce energy consumption by up to 80% through the use of dimming. The A898 Erskine Bridge is a 15-span cable-stayed box girder bridge in west central Scotland that opened to traffic in 1971. The longest span is 305m. Around 42,000 vehicles use it daily to cross the River
December 15, 2017 Read time: 2 mins
Bright nights ahead for Erskine Bridge thanks to Mallatite and TRT Lighting

Mallatite has supplied aluminium lighting columns and LED road lanterns as part of the Erskine Bridge Lighting and Electrical Refurbishment Project for Transport Scotland

The project is set to enhance night-time driving visibility and reduce energy consumption by up to 80% through the use of dimming. The A898 Erskine Bridge is a 15-span cable-stayed box girder bridge in west central Scotland that opened to traffic in 1971. The longest span is 305m. Around 42,000 vehicles use it daily to cross the River Clyde as well as he parallel Forth and Clyde Canal and the North Clyde railway line. A small part of Kilpatrick railway station is situated underneath the bridge at the north side.

Almost 300 TRT Lighting’s Aspect lanterns were supplied as part of the renovation project by Traffic Scotland to improve visibility, safety and ultimately reduce energy consumption not just across the bridge but also on the northern and southern approach roads.

Each individual luminaire is fitted with an 868MHz node allowing offsite control and monitoring all being fed back to a central control station. Contractor Lightways installed around 100 Mallatite aluminium columns and the TRT Aspect LED road lanterns.

Phase One of the project was to improve lighting levels and reduce energy usage on the North and South approaches to the bridge. Nearly 60 of Mallatite’s 12m aluminium columns complete with Aspect LED road lanterns were supplied for the south approach. Around 130 Aspect LED lanterns were supplied to upgrade the existing high-mast columns on the north approach.

By working at night and using traffic management, Lightways was able to keep one lane open in each direction.

Phase Two involved replacing the majority of the twin-armed columns on the deck of the bridge. All of the existing lanterns were also to be upgraded to LED. To keep on schedule and budget, new columns had to use the existing deck foundations.

Mallatite manufactured bespoke flange-plated columns to fit the existing foundations, enabling Lightways to replace the initial 27 columns in just five nights, said Alan Paterson, managing director of Mallatite.

Related Content

  • Busy bridge in Beijing replaced quickly
    March 31, 2016
    The replacement of a very busy road bridge in China’s capital Beijing has been carried out successfully. Due to the volume of traffic using the bridge during week days, the work had to be carried out quickly so as to minimise traffic disruption. But despite being carried out in the centre of Beijing, the replacement work for the Sanyuan Bridge just took 43 hours from start to completion.
  • Importance of road/tunnel drainage systems
    April 10, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Importance of road/tunnel drainage systems
    May 8, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports. The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Clear sailing illuminated road studs from Clearview Intelligence
    January 31, 2017
    Clearview Intelligence reports that its lighted road stud system for the A720 Sheriffhall Roundabout in Edinburgh, Scotland has picked up another award. Clearview picked up the Most Innovative Transport Project award at the UK’s recent National Transport Awards held in London. Clearview Intelligence set up its lighted road stud project in conjunction with Scottish government agency Transport Scotland, road operator BEAR (Scotland), the Transport Research Institute at Edinburgh Napier University and con