Skip to main content

Mallatite and TRT Lighting brightens up Scotland’s Erskine Bridge

Mallatite has supplied aluminium lighting columns and LED road lanterns as part of the Erskine Bridge Lighting and Electrical Refurbishment Project for Transport Scotland. The project is set to enhance night-time driving visibility and reduce energy consumption by up to 80% through the use of dimming. The A898 Erskine Bridge is a 15-span cable-stayed box girder bridge in west central Scotland that opened to traffic in 1971. The longest span is 305m. Around 42,000 vehicles use it daily to cross the River
December 15, 2017 Read time: 2 mins
Bright nights ahead for Erskine Bridge thanks to Mallatite and TRT Lighting

Mallatite has supplied aluminium lighting columns and LED road lanterns as part of the Erskine Bridge Lighting and Electrical Refurbishment Project for Transport Scotland

The project is set to enhance night-time driving visibility and reduce energy consumption by up to 80% through the use of dimming. The A898 Erskine Bridge is a 15-span cable-stayed box girder bridge in west central Scotland that opened to traffic in 1971. The longest span is 305m. Around 42,000 vehicles use it daily to cross the River Clyde as well as he parallel Forth and Clyde Canal and the North Clyde railway line. A small part of Kilpatrick railway station is situated underneath the bridge at the north side.

Almost 300 TRT Lighting’s Aspect lanterns were supplied as part of the renovation project by Traffic Scotland to improve visibility, safety and ultimately reduce energy consumption not just across the bridge but also on the northern and southern approach roads.

Each individual luminaire is fitted with an 868MHz node allowing offsite control and monitoring all being fed back to a central control station. Contractor Lightways installed around 100 Mallatite aluminium columns and the TRT Aspect LED road lanterns.

Phase One of the project was to improve lighting levels and reduce energy usage on the North and South approaches to the bridge. Nearly 60 of Mallatite’s 12m aluminium columns complete with Aspect LED road lanterns were supplied for the south approach. Around 130 Aspect LED lanterns were supplied to upgrade the existing high-mast columns on the north approach.

By working at night and using traffic management, Lightways was able to keep one lane open in each direction.

Phase Two involved replacing the majority of the twin-armed columns on the deck of the bridge. All of the existing lanterns were also to be upgraded to LED. To keep on schedule and budget, new columns had to use the existing deck foundations.

Mallatite manufactured bespoke flange-plated columns to fit the existing foundations, enabling Lightways to replace the initial 27 columns in just five nights, said Alan Paterson, managing director of Mallatite.

Related Content

  • Mabey Hire supports the Whorlton Bridge
    June 10, 2025

    Whorlton Bridge in England’s County Durham has had to be closed to traffic while a major programme of works is carried out. Every component is to be removed, refurbished and replaced.

    To facilitate the works, a bespoke catenary system has been installed, with Mabey Hire’s adaptable and modular propping equipment used to construct the temporary structure.

  • Major Europe-Asia bridge connection in Turkey
    July 1, 2014
    The 3rd Bosporus Bridge and the Northern Marmara Motorway will improve transport links between Europe and Asia and cut chronic congestion in Istanbul, Turkey’s largest city - Mike Woof reports Work is now well underway on the 3rd Bosporus Bridge and the Northern Marmara Motorway, providing a new link for Turkish city Istanbul and the region as a whole. This enormous bridge and highway project is breaking several records for Turkey in terms of scale, as well as setting a number of international records for e
  • Mersey Gateway Project reaches half-way point across the Mersey
    March 10, 2017
    The Mersey Gateway project in England has passed a significant milestone, with over half of the main bridge deck stretching across the River Mersey. Work to install stay cables on the main bridge also passed a key point, with installation of the 31st 150m long cable – the halfway point for stay cable installations on the pylon. When complete, 146 stay cables will support the 1km-long reinforced concrete bridge, with a combined load-bearing weight of more than 53,000tonnes. “We’re now more than 50
  • Rader Hochbrücke construction set for summer
    April 7, 2025
    Work on the Rader Hochbrücke (bridge) near Rendsburg, Germany, will start this summer and take five years, according to DEGES.