Skip to main content

Lighten up with Nyx Hemera’s ILCAM2

Nyx Hemera Technologies says its ILCAM2 photometer - part of the company's TLACS (tunnel lighting addressable control system) solution – helps cut energy consumption
By David Arminas May 7, 2021 Read time: 2 mins
Enclosed in a rugged painted stainless steel container, the ILCAM2 photometer runs off existing power lines in road tunnels and can help improve driver safety.

Nyx Hemera Technologies says that its new ILCAM2 power line illuminance photometer can help reduce tunnel lighting energy consumption and boost green credentials.

The ILCAM2 - part of the TLACS (tunnel lighting addressable control system) solution - measures the level of illuminance within road tunnels and underpass bores to ensure interior light levels are continuously maintained to improve lighting conditions for drivers.

The ILCAM2 is used in road tunnels within the TLACS-EM system and in underpasses with the TLACS-U. It sends the illuminance values to a lighting control cabinet using power line communication on existing power cables.

The ILCAM2 uses a highly light-sensitive photocell – silicon photo diode - filtered to provide a spectral response close to that of the average human eye in order to react to changes in light levels within the tunnel environment. The unit measures the illuminance over a standard range of 0-20,000 lux (maximum), which can be scaled to meet user requirements.

The unit is contained in a rugged painted stainless steel 316 container and has an operational temperature range from -30ºC to +70ºC. It is also CIE and IES approved or measurement technology.

Power line communication doesn't require the installation of additional control wires for control and monitoring. It uses the existing powerline cables. This means important savings on the installation time, on wires and connectors and on maintenance of the lighting system.

“With over 30 years in developing power line applications, it was obvious for Nyx’s team to improve its ILCAM with a power line version,” said Pierre Longtin, president of Nyx Hemera Technologies, based in Quebec City, Canada. “The ILCAM2 was created mainly for long tunnels as it helps save on installation time, related manpower and the cost of cables that can run for miles in such infrastructure.”

For more information on companies in this article

Related Content

  • Montreal’s new Champlain Bridge is shaping up for Christmas
    September 10, 2018
    Montreal’s Champlain Bridges - one going up, one coming down, reports David Arminas The importance of the new Champlain Bridge to Montreal and Canada can’t be overstated, given the crumbling nature of the not-so-old original Champlain Bridge. The original steel truss affair across the St Lawrence River and the adjacent St Lawrence Seaway canal is “a lifeline for residents and businesses” in greater Montréal, according to the national Auditor General - the public sector spending watchdog. “It accommodates
  • Reducing asphalt plant downtime
    December 12, 2018
    How asphalt plant control add-ons make operation easier while reducing costly downtime - *Carlos Cardenas The word downtime might as well be a curse word in the asphalt production industry. As any operator will say, unplanned plant shutdowns can end up costing a producer heavily in lost production, not to mention a line of unhappy truck drivers and asphalt customers. The key is to get ahead of the problem and spot issues before they skyrocket in severity. Fortunately, some asphalt plant manufacturers offe
  • New tests for modified bitumens and mixes with RAP
    December 19, 2014
    This month we learn about a new test which is helping to predict the performance of asphalt mixtures containing recycled materials and modifiers, and we showcase some of the new testing equipment recently launched - writes Kristina Smith Researchers in the US have come up with a new test to help owners and contractors better predict the performance of their roads. “The problem is that the current tests cannot determine the performance of new materials,” said Dr Haleh Azari, manager of the AASHTO Advanced P
  • New drilling and blasting technology aids efficient quarrying
    April 13, 2012
    Innovations in drilling and blasting and crushing and screening are bringing major economies of scale to aggregate production operations. Drilling and blasting is an area where new technology is offering major saving to quarrying companies. This is another important factor in the quarrying process, as inefficient drilling and blasting can have major financial repercussions.