Skip to main content

Lighten up with Nyx Hemera’s ILCAM2

Nyx Hemera Technologies says its ILCAM2 photometer - part of the company's TLACS (tunnel lighting addressable control system) solution – helps cut energy consumption
By David Arminas May 7, 2021 Read time: 2 mins
Enclosed in a rugged painted stainless steel container, the ILCAM2 photometer runs off existing power lines in road tunnels and can help improve driver safety.

Nyx Hemera Technologies says that its new ILCAM2 power line illuminance photometer can help reduce tunnel lighting energy consumption and boost green credentials.

The ILCAM2 - part of the TLACS (tunnel lighting addressable control system) solution - measures the level of illuminance within road tunnels and underpass bores to ensure interior light levels are continuously maintained to improve lighting conditions for drivers.

The ILCAM2 is used in road tunnels within the TLACS-EM system and in underpasses with the TLACS-U. It sends the illuminance values to a lighting control cabinet using power line communication on existing power cables.

The ILCAM2 uses a highly light-sensitive photocell – silicon photo diode - filtered to provide a spectral response close to that of the average human eye in order to react to changes in light levels within the tunnel environment. The unit measures the illuminance over a standard range of 0-20,000 lux (maximum), which can be scaled to meet user requirements.

The unit is contained in a rugged painted stainless steel 316 container and has an operational temperature range from -30ºC to +70ºC. It is also CIE and IES approved or measurement technology.

Power line communication doesn't require the installation of additional control wires for control and monitoring. It uses the existing powerline cables. This means important savings on the installation time, on wires and connectors and on maintenance of the lighting system.

“With over 30 years in developing power line applications, it was obvious for Nyx’s team to improve its ILCAM with a power line version,” said Pierre Longtin, president of Nyx Hemera Technologies, based in Quebec City, Canada. “The ILCAM2 was created mainly for long tunnels as it helps save on installation time, related manpower and the cost of cables that can run for miles in such infrastructure.”

For more information on companies in this article

Related Content

  • New low emission, versatile asphalt plant from Marini
    January 6, 2017
    Marini’s new eTOWER asphalt plants are said to complete the firm’s Top Tower line-up. The existing Top Tower plants offer capacities of 280-400tonnes/hour and the eTOWER machines are designed with output of 150 and 180tonnes/hour. The units benefits from features used in the Top Tower range such as the drying/filtering tower system. This features as innovative location for the filter and under-filter hopper, above the dryer drum, which is said to help reduce energy consumption. This modular plant can be sup
  • Hitex launches BBA certified Puma road surfacing and marking range
    February 27, 2017
    Hitex International, a global provider of road safety and surfacing solutions, has introduced the Puma range of modified MMA (methyl methacrylate) high-friction surfacing and road marking materials. Hitex says that they are quicker and easier to apply and allow contractors to control the curing process to suit available workforce. This has the potential to speed up highway works and reduce traffic congestion.
  • Cats eyes from Clearview set the tone at Switch Island in the UK
    February 23, 2018
    Cats eyes, which light up in response to changing traffic lights, will be used for the first time in the UK at a motorway junction. Highways England, the government agency, is installing around 170 of the LED road studs at Switch Island, one of England’s busiest motorway junctions – used by over 90,000 vehicles every day. Installation is expected to take around a year to complete.
  • Airstar’s bright light, the balloon Redtech series
    August 27, 2021
    All four of the glare-free Sirocco Redtech LED lights can be set up from 1.6m to 5.3m high.