Skip to main content

Kapsch secures deal for Westgate Tunnel tolling roadside systems

Kapsch TrafficCom Australia will deliver the tolling roadside system for the West Gate Tunnel Project under construction in Melbourne, Australia. Kapsch TrafficCom Australia was contracted by CPB Contractors John Holland Joint Venture to deliver the technology. It will be based upon the company’s single gantry multilane free-flow platform and next-generation stereoscopic vision technology for both vehicle detection and classification as well as automatic number plate recognition. “Almost 20 years ago Kaps
June 4, 2019 Read time: 2 mins
Kapsch TrafficCom Australia will deliver the tolling roadside system for the West Gate Tunnel Project under construction in Melbourne, Australia.


259 Kapsch TrafficCom Australia was contracted by CPB Contractors 4755 John Holland Joint Venture to deliver the technology. It will be based upon the company’s single gantry multilane free-flow platform and next-generation stereoscopic vision technology for both vehicle detection and classification as well as automatic number plate recognition.

“Almost 20 years ago Kapsch delivered the world’s first multilane free flow tolling system in Australia,” said André Laux, chief operating officer at Kapsch TrafficCom, based in Vienna, Austria, and which has subsidiaries and branches in more than 30 countries.

The 5km West Gate Tunnel - to be open in 2022 - will deliver an alternative to the West Gate Bridge, providing a second river crossing and removing thousands of trucks from residential streets. Originally called the Western Distributor, it will link the West Gate Freeway at Yarraville with CityLink at Docklands via a tunnel beneath Yarraville.

Meanwhile, the first of the two tunnel boring machines will soon arrive in Melbourne, according to the state government. A steel frame is going up for the 90m x 180m spoil shed at the Yarraville tunnelling site. Work continues at the northern portal to build the tunnel entrance and where the two TBMs will be launched.

The TBMs will be 90m long, weighing up to 4,000tonnes each and standing 15.6m in diameter. It will be the first time a full-scale TBM has been used in Victoria. Two huge retaining walls have been built either side of the tunnel site, with around 1,000 support columns driven into the ground to help keep workers safe on site.

For more information on companies in this article

Related Content

  • Growth coming for Asian construction market
    September 4, 2018
    A new report produced by research specialist GlobalData predicts continued growth for Asia’s construction market. According to the report, construction in the ASEAN region will grow by over 6% annually over next five years. The report has been published to coincide with the INTERMAT ASEAN 2018 and Concrete Asia 2018 trade shows for construction, infrastructure and concrete sectors. The data suggests that construction output in the member states of the Association of South-East Asian Nations (ASEAN) would ex
  • New developments in asphalt compaction
    June 14, 2019
    New developments in asphalt compaction offer performance gains for contractors, with future innovations being unveiled – Mike Woof writes Advanced asphalt compactors are offering huge gains in performance over previous generation machines. Better working quality and finish is claimed for the latest machines, while future developments will offer sophisticated solutions. The new ARX 91 articulated tandem roller from Ammann is designed as a high productivity compactor that can be used on both thin and t
  • Ferrovial 5G for Silvertown sites in London
    October 18, 2021
    The 5G network has been deployed in partnership with Nokia and Telent for work on the tunnel that will connect London’s Greenwich Peninsula and Silvertown district.
  • Trakm8 signs telematics contract with Colas’s Czech operations
    July 3, 2018
    The Czech division of French civil engineering group Colas will install Trakm8 vehicle use and GPS tracking systems on at least 1,000 vehicles and machines. Installation of the telematics will take place over three years in an effort to improve day-to-day management of its assets and reducing fuel consumption. Colas will hook up cars and construction machinery such as excavators, cranes and asphalt pavers so data is collected on GPS positions within certain sites, hourly utilisation reports and fuel